http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 5
Speech of the Chief Executive Officer_ ____________ 6
Economic results_____________________________ 8
Project management_________________________ 10
Employees and co-workers____________________ 14
Significant constructions______________________ 30
Overview of references_______________________ 128
Social events_______________________________ 146
Contents
1
2
3
4
5
6
KAMI PROFIT 5
www.kami-profit.sk
http://www.floowie.com/sk/citaj/kamiprofit-aj/6 KAMI PROFIT
When I was establishing the
company KAMI PROFIT, s. r. o. 10
years ago, I was doing it in order
to build up a company that would
prosper for many years. I have
started to do the business already
in 1997 as self-employed person,
but I always had the idea to build
something that will be able to exist
and function without my presence.
Not that I didn´t intend to par-
ticipate physically in operational
processes, but I wanted to create
a company with the processes set
up to function without my physi-
cal presence. Any company that
wants to be successful in a market
environment needs to know not
only itself, but also the competing
companies and their offer in the
market.
The Building industry, after tran-
sition to a market economy, has
experienced many major changes.
In socialism, all the great social-
ist companies did defend to accept
the courageous five-year plans and
were interested to use spare ca-
pacity for other works, such as the
agricultural cooperatives, where
the opportunity for barter man-
agement was always found. Many
companies failed to understand
that after the change from socialist
planning to a market economy, it
was necessary to compete for the
contracts and not to reject them,
as it was previously customary.
There were few changes even after
the privatization of state construc-
tion companies, whereas manage-
ment was not used to competition,
and the aim was rather to get to
public contracts without a real
competition. Companies privatized
like this, without existing competi-
tive pressure, had no reason to set
effective management processes.
Their management remained di-
rective and the scheme highly
inefficient without clear respon-
sibilities of involved persons. The
existence of different departments
and professions across the en-
tire spectrum of contracts caused
huge problems, for example, in the
planning of mechanization. It can
be said that these were problems
worthy of operational analysis and
optimization methods. However,
no one did practice them. Despite
their own fleet, the companies
were ordering private machinery
for the execution of construction
works. Nobody did pay attention to
high prices for public works.
Companies operating like this
had no chance to operate effec-
tively in the private sector. There-
fore, the foreign investors often
used so called construction man-
agement in order to get a good
price directly from small efficiently
managed professionals. And our
Speech of the Chief
Executive Officer
We shape
employees
focused on
customers´
satisfaction.
http://www.floowie.com/sk/citaj/kamiprofit-aj/We have10 years...
www.kami-profit.sk
Ing. Milín Kaňuščák
Chief Executive Officer
activity has started somewhere
here. At first, we were focused on
technical supervision, later on we
started to specialize in construc-
tion project management. After
managing that we decided to ex-
pand our services to the building
project management. From the
very beginning, we have realized
that the Project Manger is behind
a successful project, whereas we
perceive a mutual trust as neces-
sity. The project manger has privi-
leged position in our organization
structure. Other departments are
required to provide project man-
ager with service, especially le-
gal, administrative and economic.
The project manager is in charge
of project management. Such a
person has to be able to optimally
adjust the financial plan, schedule,
contractual relationships, as well
as all related processes. In order
to achieve the desired results, it
must be appropriately motivated,
of course. In this way we manage
to clearly define the responsibili-
ties of an individual, and to shape
an employee focused on results
and customer satisfaction. In com-
parison to privatized companies,
which do not have the responsi-
bilities clearly defined being the
result of the existence of a number
of departments with sophisticated
hierarchy of their division, it gave
us a great advantage and allowed
entry to the construction market.
Even some larger construction
players have started to order our
services in order to introduce mo-
tivation and greater effectiveness
in project management.
Ten years of our work testifies to
the fact that we found our space in
the market. And the economic re-
sults in recent years confirm our
progress. All this would certainly
not be possible without the right
employees. Therefore, my great
thanks go to my father, Mr. Milan
Kaňuščák, who brought me to the
building industry and assisted in
the development of the company.
He was an idol for the other new
colleagues and trained them in
practice. My thanks also go to the
current General manager of the
company, Mr. Roman Jánoško, who
has always managed and devel-
oped the company reliably during
my short absence. Many successful
projects are behind us and I firmly
believe that we have many more
ahead.
I would like to thank all our
customers for their trust and the
possibility to work for them. Last
but not least, let me thank all the
employees and co-workers for
their help and support in life and
at work. We would not have been
here without you!
KAMI PROFIT 7
http://www.floowie.com/sk/citaj/kamiprofit-aj/8 KAMI PROFIT
ECONOMIC
RESULTS
www.kami-profit.sk
1
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 9
2009 2010 2011 2012 2013 2014 2015
SALES AND INCOME
KAMI PROFIT, s. r. o.
www.finstat.sk
DISTRIBUTION OF SALES AND REVENUES
KAMI PROFIT, s. r. o.
www.finstat.sk
€ 2.327.047
€ 5.775.877
2009 2010 2011 2012 2013 2014 2015
€ 111.173
€ 390.437
€ 0
€ 92.005
€ 83
€ 3.042
€ 5.775.877
€ 427.278
€ 53.878
€ 12.638
€ 7.468
€ 52.359
€ 52.524
€ 636.682
€ 2.520.375
KAMI PROFIT, s. r. o.
Registration number: 35943301
VAT number: 2022023872
VAT identification number: SK2022023872 according to § 4
Registered office:
KAMI PROFIT, s. r. o.
Pri starom letisku 17, 831 07 Bratislava
Sales and income: € 5,871,007.00
Profit: € 748,192.00
Assets: € 3,600,116.00
Equity: € 1,636,007.00
Date of establishment of the company: 30 June 2005
Company registered in Commercial register of District Court
Bratislava I, section Sro, insert no. 36648/B
Legal form: Limited Liability Company
SK NACE:
According to the fin. statements
71121 Engineering activities and consultancy services
According to the Statistical Office of
71129 Other engineering activities the Slovak Republic
and related technical consultancy
41 209 Construction of residential and non-residential
buildings
Number of employees:
2015 19 to 40 employees
2014 10 to 19 employees
2013 5 to 9 employees
2012 3 to 4 employees
History of economic results
INCOME TAX
KAMI PROFIT, s. r. o.
www.finstat.sk
production
sales of fixed assets and materials
other operating income net of income transfer
interest income
other financial revenues net of revenues transfer
Income tax Tax payable
PROFIT
KAMI PROFIT, s. r. o.
www.finstat.sk
€ 31.007
€ 222.296
€ 222.696
€ 327.927
€ 469.887
748 192 €
2009 2010 2011 2012 2013 2014 2015
€ 100.385
€ 134.608
€ 215.814
http://www.floowie.com/sk/citaj/kamiprofit-aj/10 KAMI PROFIT
Ten-year activity of the company
KAMI PROFIT, s. r. o. on Slovak con-
struction and real estate market is
mainly about active and thorough
implementation of the project man-
agement. The company has had a
development, in which it had to re-
spond flexibly to market turbulence,
but also new challenges. Those rep-
resented reconsideration of previ-
ous measures and search of current
methods. The business activities
were gradually expanded, and it is
clear when you scroll through the
pages of this publication that is goes
across different architectural typolo-
gies and civil engineering works. It
contains extensive residential pro-
jects and smaller residential con-
struction, shopping centres, retail
stores, industrial buildings and de-
manding civil engineering works.
However, we had to start our inter-
view with the owner and Chief Ex-
ecutive Officer of the company, Mr.
Milín Kaňuščák, during an extensive
residential project Tri veže (Three
Towers) in Bratislava, which became
the first milestone in the company´s
activities. The support project man-
agement team was created during
this project and it has successfully
operated up to the present day. Mr.
Roman Jánoška was the deputy of
Mr. Milín Kaňuščák on the project
and Mr. Ľuboš Kormaník joined them
during the construction.
Tri veže (Three Towers) are among
the largest residential projects in
Bratislava implemented during the
construction boom. How did you get
to it?
Development Company Cresco
dealt with large area on Bajkalská
Street with the
intention to build
a large residential
project, whereas
they invited us to
cooperate with
them in the field
of project man-
agement in 2006.
We have been in
the project since the zoning decision
phase to the hand-over of apart-
ments to the clients. The design
development of the towers them-
selves was very interesting. Initially,
they were cubical in shape, but the
company Cresco wanted to have
them more “chic”; therefore they
contacted the architect Mr. Martin
Wolf of Chicago architectural office
SCB, who created a dynamic ellip-
tical shape for them. However, the
task of Mr. Martin Wolf was more or
less over and the Three Towers were
completed up to implementation
project by the architect, Mr. Peter
Moravčík.
How did the construction prepara-
tion look like for this project
The preparation to the object foun-
dation itself has taken three quarters
of a year during which we have over-
come several obstacles. The project
required relocation of the main road
and the stop of former bus station
on Bajkalská Street. We were deal-
ing with caliduct from Trnavská road
as well as large cable duct, which
was quite expensive at that time. At
this stage, it was important that we
did not “fool” ourselves by the speed
of construction boom in Bratislava
and paid attention very responsibly
to the preliminary stage. Before the
tender for general contractor, we
prepared with the architect Mr. Peter
2 PROJECT MANAGEMENT
MILÍN KAŇUŠČÁK:
The Project management
in KAMI PROFIT is mainly
about responsibility.
If a contractor failed to carry
out some construction details
according to the agreement,
we didn´t compromise anything
fundamental.
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 11
Moravčík more than 1 500 specific
construction details. It was so-called
“value engineering”, in which we
have discussed individual aspects of
construction with the Investor: how
much will the facade cost, how it will
be assembled, which kind of insula-
tion will be used and the like. All de-
tails were also included in the tender
documentation, which later proved
to be our great advantage.
In what was the benefit most vis-
ible?
The design documentation pre-
pared in good-quality caused, that in
principle, there are no extra works in
the Three Towers project. Therefore,
we had a strong argument in our
hands, and if the contractor failed
to carry out some construction de-
tails according to the agreement,
we didn´t compromise anything
fundamental. As the final result of
construction supply from Alpine-
Chemkostav in the amount of EURO
1.9 billion, less works were execut-
ed, even in the context of induced
investments.
These included also the transport
solution that initially seemed to be
the largest scarecrow...
It should be considered, that there
are 630 apartments and 850 parking
spaces in the Three Towers, which is
a decent volume. That´s why many
people warned us, that the biggest
problem will be the transport. For-
tunately, the fears proved to be un-
founded. The charm lies in the fact,
that cars from underground garages
are not exiting to Bajkalská but Tr-
navská street. We managed to create
a synergy that does not cause traffic
collapse.
Literally everyone was constructing
during the peak of the construction
boom in the years 2006-2007, and it
was certainly not easy to supervise
construction quality. What was the
tender for general supplier of the
Three Towers like, and how was the
construction carried out?
It was one of the most difficult
tasks during which we were monitor-
ing quality; therefore we addressed
a wide range of reputable companies
including the biggest ones, such as
Metrostav, Zipp and Chemkostav.
Out requirement was to have one
reliable contractor and we did finally
choose Chemkostav. Meanwhile, it
teamed up with Alpine, and the Tree
Towers were finally implemented by
the Joint Venture Alpine-Chemko-
stav. At the end it turned, that the
construction is not as difficult as it
had seemed at the beginning.
Did anything slow down the con-
struction?
There was one moment. We found
to be in delay during the construc-
tion of eight floor of the first tower.
We started to search for solutions in
order to speed up the process, be-
cause we needed to get eight days
for one day. We were able to catch up
the time delay by using construction
system from the Austrian company
Katzenberger, which supplied us
with half-prefabricates made-to-
measure, known in Slovakia as so
called filigraned ceilings and walls.
They significantly shortened the
Time for completion. The first and
second tower got the final building
approval at once, the third one half
a year later. This progression was
set due to the sale, because the in-
vestors did not want such a large
volume of apartments to go on the
market at once. It was also connect-
ed with the need to change the con-
struction before completion. We had
to think up a separate entrance to
the towers, as well as the entrance
to the garages. Everything turned
out fine and I can responsibly say
that the whole project was commer-
cially successful and comparable
to other successful projects in Bra-
tislava. All apartments have been
nearly sold, the loans were returned
to the banks, and a large successful
project stands behind the investor.
Let´s get back to the preparation
of the project. What emphasis is
placed on this phase of the con-
struction process nowadays?
Project preparation with precise
finalization of details, relationships
between involved subjects and prep-
aration of commercial contracts is
still being underestimated, and it is
the fundamental stumbling block
of the whole process. Everything is
dealt superficially, and the partici-
pants get to know how many impor-
tant elements are still not properly
prepared often only on site. Espe-
cially, in super quick actions using
European funds, we often find on our
own skin, that a lot of obstacles are
put on the involved entities, whereas
people, who have no experience with
construction works often decide
about financial matters. It means,
even if you are winning construction
contracts through EU funds, it is not
easy to sign them. When signing the
http://www.floowie.com/sk/citaj/kamiprofit-aj/12 KAMI PROFIT
PROJECT MANAGEMENT
contract, we find that the project is
completely out of reality. The may-
ors of the cities and municipalities
don´t have a lot of support in ob-
taining EU funds either, because the
procedures are too bureaucratic and
far-fetched. Just to sum it up:
the readiness of projects is still
insufficient, whereas nowadays, no
one wants to plan things ahead of
four, five or very likely ten years. At
the time of information technology
neither the designers want to deal
with the details and solve any, even
the smallest detail. It is a mistake.
And now we get more particularly
to the very content of project man-
agement. What are the most im-
portant attributes?
We are trying to profile as a man-
agement company, which does not
have creative and design depart-
ment, but we try to organize every-
thing for the client in time, place and
money intended for the success of
its project. In our understanding, the
project management means mainly
that the competent manager acts as
a director of the project and through
our support it shall bring the project
to a successful end. It must follow
harmonious and quality coopera-
tion, as well as consequent check-
ing of all key elements of the project
– schedule, involved people, supply
companies, authorities, regulations
and acts. At the same time, it is also
responsible for a large amount of fi-
nance; therefore it must be a strong
personality – decision-maker, who
will successfully manage the de-
manding and complex process.
You have mentioned a support to
relevant project manager. How
does the coordination and motiva-
tion of their work look like?
We try to set up a project for the
people to be highly motivated. The
manager knows, if it makes a good
profit on the project, it will get ad-
equately rewarded. At the same
time it must also deal with finances
as if they were its own. There are
many pitfalls in the world, and the
project manager is not the one to
barter with the suppliers. Its main
task is to protect investors and us.
We always emphasize to it to be well
prepared for the
project in advance.
If the project man-
ager does not fore-
see, then it usually
ends badly. Some-
thing unexpected
can always hap-
pen on site, but the
problems are minimized, if the pro-
ject manger studies and gets ready
for all possible alternatives. And
this is the success of a good project
management.
Can a project manger choose a sup-
plier by itself?
It can, but it must be a good con-
tract with a good supplier. If it isn´t
so, the project manger is unable to
check anything, doesn´t know to ac-
cept delivery or executed work from
the supplier, it is forced by poor qual-
ity, sleeps badly....It has happened
several times that the project man-
ger came to us with such an offer. We
replay that it may do, but we also ask
whether it is aware of the increased
level of responsibility and possible
consequences. Although, it is possi-
ble that it will like the entire project
more, and it can professionally move
forward, but mentally, it can take a
lot of its energy that it could dedicate
to more effective work.
What consequences do you draw, if
the manger makes a more serious
mistake?
We don´t take back the decisions
of project mangers too often. Of
course, we do train them for this job
and we don´t leave them all alone in
the process. We go with them into
terrain, and if it is necessary, we
consult together individual ques-
tions. At the same time, they can
use the services of our lawyers and
consultants-specialists. However, it
is not directive from our side; they
must feel if they need it. We must
also be prepared for the mistakes
of our employees. Any entrepreneur
must cope with it; otherwise it would
not have to do the business at all.
You have to learn the lesson from
each unfortunate decision, and even
if the mistake has taken some time,
given reference or money, we have
to go on.
Once you have mentioned that you
do not take people who are linked
with the past. How did you mean it?
After our experiences, we do not
take a person from a large construc-
tion company anymore, because it
is negatively influenced by its com-
plicated hierarchy. They have mini-
mum competences as site manag-
ers, as well as project managers in
the company, and while some deci-
sion passes through production and
technical director, post-controlling
to the general director, incredibly a
lot of time passes. These people are
then inevitable buck-passers act-
ing without contracts and possibility
to decide quickly. And when such a
person comes to our company, sud-
denly it is baffed and unable to solve
anything independently.
Who does order your services –an
investor or an architect?
The main task of a project
manager is to protect
the Investor and us.
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 13
Our services should be ordered
mostly by the investor, but we found
out that also large construction com-
panies do not have their own capaci-
ties, by which they would be able to
manage the contract as good as we
imagine. We are currently working
with the company Dúha, a.s., with
which we have found a mutually ben-
eficial model of cooperation. At first,
we do budget the contract, agree to-
gether for how much we are able to
build it, and if we can earn something
extra, then we share our margin with
the supplier. In this relationship we
play the “success fee”, it means, we
take over full responsibility on behalf
of the general contractor. We man-
age it by ourselves and charge on
its behalf. That´s what we did in the
project of Urban Industrial and Tech-
nological Park in Trnava in the years
2009 – 2012; another person has be-
come a part of KAMI PROFIT team,
during the construction ,Mr. Peter
Janega, who, as a project manager,
led the construction of Kulturpak in
Košice in 2012, which was designed
by the architect, Mr. Irakli Eristavi.
This was a project for nearly EURO
20 million and won many architec-
tural awards in Slovakia.
The Tri veže (Three Towers) in Bra-
tislava, Kulturpark in Košice, Ur-
ban Industrial Park in Trnava are
certainly among the flagships of
your previous activities. What else
would you add to them?
We would certainly add the con-
struction of Hypernova in Prešov,
which we did cover not only from
project management point of view,
but also as a developer. We bought
the land, prepared zoning per-
mit, building permit and finally we
handed it over to Hypernova. The
other part of the land, on which the
Max Euromax Slovakia shopping
centre is placed now, is an inter-
esting story. Originally, apartments
should be built there, but due to
weak state support for apartments
in the regions, only a part of it was
build. We managed to change the
building permit to construction of a
large shopping centre, in which the
company Euromax Slovakia joined
the Hypernova. We were doing the
construction supervision and pro-
ject management during the entire
construction up to the final building
approval of the shopping centre.
You are managing two tunnels –
Ovčiarsko, Višňové and the mo-
torway section Lietavská Lúčka
– Višňové – Dubná Skala. What are
the specifics of a project manage-
ment in transport infrastructure?
It is substantially different from
residential construction or retail
projects. Everything is lengthier, the
investors and designers have more
time. These projects are large-
scale projects, but more authori-
ties and people are involved in the
process, thus the effectiveness in
construction of infrastructure sig-
nificantly decreases while the prices
are much higher.
Where do you see the causes?
The demands for effectiveness
in building constructions are influ-
enced by fierce market competition.
If you are effective, everyone knows
what to do, and everyone is keeping
its competitive advantage. Concern-
ing the motorways, the effective-
ness was often deformed by agree-
ments between large construction
companies and there was not so
much competition to activate the
standing waters of established pro-
cesses. I think it would be enough
to open standard tenders and invite
also other companies. There was an
attempt to make a deal on the mar-
ket for the Tri veže project, therefore
we invited new construction compa-
nies to the tender and suddenly the
agreement was over. The motivation
of companies to save money of the
investor can be only guaranteed by
the competition. You can press down
the price only by increased competi-
tion, and that is the reason why the
prices of motorways have decreased
in the recent period. For example, in
the first tender for the motorway
section Jánovce – Jablonov 1, thir-
teen companies submitted their bid,
which is unprecedented. At Višňové
motorway tunnel we perform pro-
ject management for the company
Dúha, a.s. , which is implementing
it with the company Salini Impregilo
S.p.A. At first, we were on the third
place in the tender, but the Su-
preme Court has decided about the
cartel agreement between the win-
ning companies, and on the basis of
public procurement it turned to our
favour. Therefore the transparent
competition is the path to the effec-
tiveness of projects. And it has also
been one of the central objectives of
our so far efforts.
Author of the interview:
Ľudovít Petránsky
http://www.floowie.com/sk/citaj/kamiprofit-aj/14 KAMI PROFIT
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 15
EMPLOYEES
AND CO-WORKERS
3
www.kami-profit.sk
http://www.floowie.com/sk/citaj/kamiprofit-aj/16 KAMI PROFIT
EMPLOYEES AND CO-WORKERS
Milín Kaňuščák
Owner and Chief Executive
Officer of the company
He is the founder of the company
KAMI PROFIT, s. r. o. He has been
in the company KAMI PROFIT,
s.r.o. as the owner and Chief
Executive Officer for ten years,
since the inception in June 2005.
The significant projects, in which
Mr. Kaňuščák participated in,
include: EUROMAX SLOVAKIA, a. s.
(MAX Prešov , MAX Nitra, MAX
Trenčín, MAX Poprad) III Towers
in Bratislava, Urban Technology
and Industrial Park in Trnava,
construction supervision and
engineering services for the chain
REWE Billa, G4S Security Systems
(SK), Višňové tunnel and Ovčiarsko
tunnel. He has four children:
Lucia, Margaréta, Kristína and
Barbara. His hobbies are: flying/
piloting of sports planes, fast cars.
From the sport activities he is
dedicated to skiing and hiking. He
enjoys travelling and he is a keen
collector of valuable coins.
Roman Jánoška
General manager
He has started to work in the
company KAMI PROFIT, s. r. o. as
project manager and was holding
this position from July 2010 to
September 2010. He was working
as the Chief Executive Officer of
the company from October 2010
to April 2012. He currently holds
the position of general manger
of the company, but he is still
dedicated to project management.
The major projects, in which Mr.
Jánoška participated in, include:
Kulturpark Košice, Apartment
buildings Dubnička, Wüstenrot
Branch office, Wüstenrot Kožatex,
Pelicantravel.com, s. r. o., Urban
Technology and Industrial park
Trnava, Polyvlies, projects for
the chain REWE BILLA, Business
Centrum Trnava fy. AMEC,
Ballymore EUROVEA, Residence
Valley Koliba in Bratislava, TECHO,
N3 Towers. He is single, spending
his free time doing sports such
as skiing, football, hiking and
traveling.
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 17
There is nothing in the world that can replace persistence.
Persistence and determination are omnipotent in themselves.
Viera Kadúchová
Business director
She has joined the team of KAMI PROFIT
in May 2016 as a Business director, in
which she can capitalize on her years
of experience in the field. During her
practice, she has gone through various
positions in construction and development
companies. She has cooperated with
Spanish investors and was in charge of
the processes of integrated management
system in construction company. She led
the purchasing department for projects of
civil and water retaining structures, but
also in the construction of infrastructure.
Out of important constructions, in which
she has participated in, we may mention
the construction of combined cycle power
plant in Malženice, the reconstruction of
old indoor swimming pool Kunsthalle in
Košice, Intermodal transport terminal
in Žilina and the section of D1 Motorway
Hubová – Ivachnová. She is interested
in issues of contractual agenda in the
construction industry according to
international conditions of FIDIC. She is
married and has two sons, Lukáš and
Filip. During her free time, she likes to
relax in the company of friends by walking
in nature, skiing or cycling.
Vladimír Duchoň
Production director
He has been working for the company
since July 2016. In the past, he worked
at the middle and senior management
level of foreign multinational
companies. He participated in many
significant infrastructure projects
abroad, such as the Schwechat airport
infrastructure, the A4 and A6 Austrian
highways and the Prague bypass. In
Slovakia, he worked as an executive
manager in structural engineering
companies. Some of the more important
projects in Slovakia include Toifl
logistics warehouse in Malacky, Soravia
Shopping Palace, the DELL building
and St. Michael’s hospital in Bratislava
and the Catholic university’s library in
Ružomberok. In the past he also worked
as an expert for renovations and
reconstructions of historical buildings
and protected monuments, especially in
removing moisture by natural methods.
He is single. In his free time he prefers
Slovak nature to the foreign one. He is
also interested in medieval and current
history of Central Europe. He likes good
classical and popular music and sport.
http://www.floowie.com/sk/citaj/kamiprofit-aj/18 KAMI PROFIT
EMPLOYEES AND CO-WORKERS
Miroslava Farkašová
Office manager/accountant
She has been working as office
manager and accountant in KAMI
PROFIT, s. r. o. since January
2015. She is married and has two
children. Her hobbies are books,
walks, actively doing sports, she
likes to swim, skate and bike.
Due to the fact, that she has loved
the nature and animals since her
childhood; she graduated from the
Department of Zoology Faculty of
Natural Sciences in Bratislava.
The main theme of her final
thesis was Freshwater Jellyfish
in Slovakia. Then she did a
doctorate in parasitology, whereas
she examined the parasites on
cancers. After a long maternity
and parental leave, she decided
to work in a different field than
scientific. She is very satisfied in
the current position.
Róbert Čorba
Lawyer
He has been working as the
lawyer of the company KAMI
PROFIT, s. r. o. since April 2014.
The major projects, in which he
participated in include: Višňové
tunnel, Ovčiarsko tunnel,
Apartment block Domino. He is
single. Loves to travel, prefers
sightseeing tours, which offers him
knowledge of foreign countries
from a different perspective. His
other hobbies include cooking and
good music. His free time is also
given to the sport activities such as
hiking, volleyball and skiing.
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 19
Juraj Šnirc
Project manager,
budget manager
He has started to work in KAMI
PROFIT, s. r. o. in March 2014. He
works at the position of project
manager, also prepares bids and
budgets, and participates in the
preparation of construction and
support documents for public
procurement. His major projects,
in which he participated in include:
Family house in Ivánka pri Dunaji,
and reconstruction of the interior
of the insurance company Allianz
- Slovak Insurance Company. He
is married and has two children.
His hobbies include fast cars
and motorbikes, which he likes
to change for a wine tasting and
enjoyable company. His free time
is given to the development of his
own house and football.
Lenka Pomykaczová
Marketing assistant
and specialist in the preparation
of bids
She has joined the company
KAMI PROFIT, s. r. o. in March
2013. She covers marketing
activities as well as specializes
in the preparation of bids
and documentation for public
procurement. The major projects,
which Mrs. Pomykaczová
participated in include: Apartment
block Domino, PMC Slovnaft. She
has two children – Adelka and
Libor. Her biggest hobby is the
children and family. She enjoys
working in the garden, loves
barbecue and travelling. She likes
skiing.
http://www.floowie.com/sk/citaj/kamiprofit-aj/20 KAMI PROFIT
EMPLOYEES AND CO-WORKERS
Pavol Hayden
Project manager
He has been working as project
manager in KAMI PROFIT, s. r. o.
since September 2012.
He focuses on processing of
budgets, as well as preparation
and implementation of
constructions. His significant
projects include: Urban Industrial
and Technological park Trnava,
Modernization of Wüstenrot
Branch offices, reconstruction
of KOŽATEX building,
Apartment Buildings Dubnička ,
VosllohSchwabe , STM Power and
PMC Slovnaft project . He is happily
married and has three children:
Hanka, Tomáško and Katka . His
biggest hobbies include family,
he likes to watch a good movie
or cook some delicacy. From the
active sports he prefers hiking,
skiing and football.
Miroslava Babirátová
Lawyer, specialist
in the preparation of bids
She has joined the company
KAMI PROFIT, s. r. o. in October
2013. She holds the position
of corporate lawyer and at the
same time she prepares bids and
support documentation for public
procurement. The significant
projects she participated in
include: Apartment block Domino,
ČSPL SHELL Presov, ČSPL SHELL
Červeník, Slovnaft, Apartment
buildings Dubnička. Her hobbies
are travelling, hiking, dancing,
photographing, shopping, but she
is not in denial of active sports
either.
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 21
Ľuboš Kormaník
Senior project manager
He has started to work as junior
project manager for the company
KAMI PROFIT, s. r. o. in December
2011. Gradually he worked his
way up to the position of Senior
project manager. He carried
out the project management for
the constructions like III Veže,
Production of non-woven fabrics
POLYVLIES, Sereď - I. and II. phase,
Apartment block Domino, ČSPL
SHELL Červeník, projects for
chain of Billa, Ovčiarsko tunnel or
Višňové tunnel. He is married and
has daughter, Kristina. His hobbies
include family, football and skiing.
Peter Janega
Senior project manager
He has been working as project
manager in KAMI PROFIT, s. r. o.
since November 2009. The major
projects, in which he personally
participated in as the project
manager include:
Urban Industrial and Technological
park Trnava , Residence Valley
Koliba Bratislava , project
management for chain of Billa,
Kulturpark Košice, Višňové tunnel,
, Ovčiarsko tunnel, Apartment
block Domino. He is married and
has two children, Jakub and Adam.
His hobbies are: skiing, hiking and
the sea.
http://www.floowie.com/sk/citaj/kamiprofit-aj/22 KAMI PROFIT
EMPLOYEES AND CO-WORKERS
Alexander Halža
Junior project manager
He has been working as junior
project manager in the company
KAMI PROFIT, s. r. o. since August
2014. He participated in the project
of reconstruction of Shell Červeník
petrol station. He is single,
childless. His hobbies include
cooking and he cannot resist
a good movie. He spends his free
time travelling, hiking and also
doing sports.
Tomáš Madi
Junior project manager
He has been working as junior
project manager in the company
KAMI PROFIT, s. r. o. since August
2014. His significant projects
include Billa Bory Mall and Billa
Korzo. He is single, childless. He
spends his free time travelling
and swimming. He is interested in
psychology, which is very helpful
to him in the project manager
profession.
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 23
Norbert Palenčár
Senior project manager
He is implementing and applying know-
how for the Austrian market in the company,
which he gained from his long experience
directly from Austria as well as the
organization and management of projects
in Austria from Slovakia. So far experiences
are mostly related to the construction of
residential buildings, residential complexes,
office and public buildings in the size of
1.000 – 5.000 m2 of usable area. It concerns
an implementation of rough structures or
turnkey construction by own capacities
complemented by selected suppliers. This
comprehensive management involves a
search for investors, calculation of price
quotations, implementation of projects with
respect to compliance with deadlines, quality
and cost saving identification in favor of the
client, dealing with contractual relationships
with the investor and subcontractors,
communication with local authorities,
respecting demanding working and legal
relations in Austria, etc. He has been working
in the company since May 2016 and currently
implements the project New-building of 24
flats with underground parking garage. He
is married and has two sons. His hobbies
include traveling and sports.
Tomáš Krutek
Project manager
Tomáš has been working as a
Project Manager in KAMI PROFIT
for one year. He is responsible for
supervising of the construction
implementation and he acts as a
technical supervision on projects.
His largest projects include
construction coordination of the
GAT terminal at the Bratislava
airport, managing of the fuel
station reconstruction, etc. Tomáš
has got experience from the
previous profession with designing
of the business center, production
hall and residential objects and
management of the development
projects. He likes interior design
and architecture in his leisure time
as well as travelling, cycling and
gliding
http://www.floowie.com/sk/citaj/kamiprofit-aj/24 KAMI PROFIT
EMPLOYEES AND CO-WORKERS
Štefan Litomerický
Junior project manager
He has joined the company
KAMI PROFIT, s. r. o. in January
2015. He works as junior project
manager. His significant projects
include the project for provision of
construction management services
(investment projects) implemented
in the chain of service stations
of the company SLOVNAFT, a. s.
He is single. His hobbies include
travelling and sport activities.
Simona Skirkaničová
Junior lawyer
Simona has joined KAMI PROFIT,
s. r. o., in May 2016. She graduated
from the Faculty of Law at the
University of Trnava. She devotes
her spare time to writing articles
about legal issues. She also enjoys
exploring new places and meeting
new people. Sport is her relax,
especially running and she likes
reading a good book.
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 25
Peter Podmanický
Budget manager
He has been working in KAMI
PROFIT since July 2015. He
graduated from the Faculty of
Civil Engineering of the Slovak
Technical University in Bratislava,
Department of Economics and
management of structures. In
previous and current employment
he has participated in construction
of shopping centers in Nové
Zámky, production hall for lifts
in Krupina, reconstruction of
dining room of the Faculty of Civil
Engineering of STU Bratislava,
construction of the Catholic
university’s library in Ružomberok
and SHELL fuel station in Považská
Bystrica in different technical
and economic managerial job
positions. His favorite sport
activities include hiking, skating,
skiing, history and chess.
Martina Galádová
Assistant for marketing
and business department
She has joined KAMI PROFIT,
s. r. o., in January 2016. She is
responsible for preparation of
materials and documents for
public procurement and private
contracts. She also participates in
marketing activities.
Martina is happily married, without
children. Her favorite hobbies
include driving, traveling and
swimming. She is also a huge fan
of Tesla and Elon Musk, of course.
http://www.floowie.com/sk/citaj/kamiprofit-aj/26 KAMI PROFIT
EMPLOYEES AND CO-WORKERS
Simona Semanková
Architect
She has been working as
an architect in KAMI PROFIT,
s. r. o., since November 2015.
She participates in development
projects as for example: Family
house in Čierna Voda and Flat
house in Prešov. She prepares new
architectural studies or redesign
for rent houses. Her hobbies
are travelling, photography and
design. She likes to spend time
with friends doing different sport
activities.
Marek Eliáš
Junior project manager
Marek has been working in
KAMI PROFIT, s. r. o., since August
2015 as a junior project manager,
he participated in projects of
reconstruction of SHELL and
SLOVNAFT fuel stations and he
is responsible for complaints
department. As a young man
he likes football very much and
practices crossfit.
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 27
Michal Čemez
Junior project manager
Michal graduated at the
Faculty of Civil Engineering of
the Slovak Technical University in
Bratislava, division of the Building
technology in 2011. He has
worked as a Preparation worker
and Technician/estimation clerk,
realization and management of
the construction and as a Project
manager.
Michal prefers to spend his free
time with his friends, likes to play
football, squash, cycling and wall
climbing. He also likes to read
books, going to the theatre and
concerts and playing computer
games.
Oľga Ježíšková
Specialist for public tenders
Oľga has joined the company
KAMI PROFIT in June 2016 and she
is preparing and completing the
business and public procurement
offers for our clients. She did study
the Business and Marketing at the
Economic University in Bratislava
and she has over the 10 years
experience of working in this field.
She spends her free time with her
daughter Nikolka and her family,
she likes music, travelling and
playing golf.
http://www.floowie.com/sk/citaj/kamiprofit-aj/28 KAMI PROFIT
EMPLOYEES AND CO-WORKERS
Marek Miškovič
Assistant of the construction supervisor
He has been working in KAMI PROFIT, s. r. o.,
since August 2015 as the assistant of construction
supervisor. His significant projects include
Logistics Centre and light industrial production in
Sereď as well as the development of the Pečivárne
plant in Sereď. He is single. His hobbies include
playing guitar, swimming and good music, besides
he cannot resist a good book or movie.
Peter Kukučka
Assistant of the Project manager
He has joined the company KAMI PROFIT in
August 2016 after graduation from the Faculty of
Civil Engineering of the Slovak Technical University
in Bratislava. He works on the RETAIL PARK
Mlynárce project. He participated in the study
program: Architectural structures and design at
the STU in Bratislava. His diploma thesis dealt with
detailed design of an administrative building with
special operation for the production of microscopes,
which was designed with an emphasis on ecology
and energy efficiency. He likes music, hiking and
travelling, especially by train.
Marek Ballay
Project manager
Marek has over ten years of experience in
construction industry; he worked as a preparer,
budget manager, site manager and project
manager in construction companies in Slovakia.
He participated in the construction of the project
Meinl Residence, which was awarded in the
competition: Building of the Year 2014. He has
joined KAMI PROFIT in 2016 and works as a
project manager for the contract of Construction
of Slovnaft fuel station on Prístavná street in
Bratislava. He is married and has a daughter,
Stella. He spends his free time in the garden and
fitness.
Milan Rajtár
Construction supervisor
He has joined the company KAMI PROFIT
as construction supervisor for road and civil
engineering constructions. The major projects in
which he participated in a previous employment
include special constructions for air traffic services,
Hippo Arena sport complex in Šamorín and sport
grounds. His favorite sports include hockey and
handball, which he played also professionally.
Peter Šuba
IT & Process manager
He has been working for the
company KAMI PROFIT, s. r. o.
since 2015. He applies his working
experience form IT field and
living abroad, as well as fluency
in several foreign languages for
the implementation, management,
maintenance and checking of
support processes and IT, taking
into consideration the needs of
customers and suppliers. He
spends his free time with friends,
guitar and exploring the different
places of our planet.
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 29
External Co-Workers
Jozef Kormaník
Site manager
He has been cooperating with the company
KAMI PROFIT, s. r. o. since March 2014 as site
manger. His significant projects include the
Apartment buildings Dubnička in Bánovce nad
Bebravou.
Pavol Baxa
Project manager
He has been cooperating with the company
since November 2015. He has many years of
experience in the drafting and implementation
of policies for development of housing and
linking them with the policies aimed at
employment, education and social affairs. He
has extensive experience in the design and
project management of various forms of social
housing, especially at the municipal level. He
has experience in the preparation of national
and local legislation in the field of housing.
He understands the municipal and regional
policy and has been involved in the drafting
and implementation of sector policies at these
levels for a long time. His major works include in
particular, the drafting of rules and organization
of the sale of apartments from the property
ownership of the city of Bratislava, drafting of
rules for renting the apartments owned by the
city of Bratislava, the Young family house project,
Fortuna lodging-house and the Kopčany lodging-
house projects.
Milan Kaňuščák
Construction supervisor
His primary scope within the company
KAMI PROFIT, s. r. o. is the performance
of construction supervisor for the projects
on the Food Chain Billa (reconstruction of
Billa supermarkets throughout Slovakia -
Bratislava , Michalovce , Levoča, Liptovský
Mikuláš , Poprad , Svit, Ružomberok, Sereď,
Bardejov, Handlová, Bánovce nad Bebravou,
etc.), MAX Prešov, MAX Nitra.
Imrich Sedlák
Construction supervisor
He has been working for the company KAMI
PROFIT, s. r. o. since 2012. His main activity
includes the performance of construction
supervisor. He worked on significant projects
such as: HIPO Aréna within the riding
area Šamorín, Kulturpark Košice or the
reconstruction of fire stations in the Zemplín
Region.
Albert Vavrek
Construction supervisor
He performs the activity of the construction
supervisor for the company KAMI PROFIT, s.
r. o. He cooperated on the projects implemented
for the food chain Billa Košice and IKD Košice.
Michal Sojka
Construction supervisor
He has started to cooperate with the
company KAMI PROFIT in 2012 as the
construction and technical supervisor of the
reconstruction of Billa in Liptovský Mikuláš –
Podbreziny, moreover, the construction of new
Billa store in Topoľčany, reconstruction of Billa
in Lučenec, Banská Bystrica and Turčianske
Teplice. He has experience with working for
foreign investors also from his previous jobs
in the Czech Republic and Norway. At the
moment, he works as the construction and
technical supervisor on the IKEA Malacky
project. He also supports the activities related
to budget management. He is fluent in English
and German. He is happily married, actively
dedicated to combat sports, swimming and
skiing. He enjoys traveling and reading books.
http://www.floowie.com/sk/citaj/kamiprofit-aj/30 KAMI PROFIT
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 31
SIGNIFICANT
BUILDINGS
4
www.kami-profit.sk
http://www.floowie.com/sk/citaj/kamiprofit-aj/32 KAMI PROFIT
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 33
Roofs are designed
in the form of
walking terraces,
and create space
for relaxing and
enjoyable meetings.
The spaces for regeneration of physical and psychic powers are not missing.
III Veže residential project in the centre of Bratislava´s New Town is
characterized by strategic location, proximity to the centre, environment
suitable for active relax and a wide range of services related to housing.
III Veže residential complex offers
comfortable, functional and flexible
apartments of different size. In each
tower there are 211 apartments with
different disposition and sizes from 40
to 220 m2. Architectural design of the
complex is divided into the bottom part of
garage house of significant horizontality
and three objects of tower bodies of
residential structure with the ground
floor for facilities. Against the bottom
part parallel to the Bajkalská street, the
Towers´ objects are positioned at an
angle, which on the one hand optimizes
light levels in individual apartments, on
the other hand it is a source of dynamic
expression of the overall mass of the
complex. The bottom part – garage house
is in the axis of the entrance to the sport
hall Elán perforated by passage with
facilities. Garage house is of rectangular
shape, while the three towers are of an
oval shape in the floor plan.
The basis of tower´s disposition is the
communication core with elevator hall and
two escape routes of C type with fire halls,
two passenger lifts and one evacuation
lift. Twelve apartments are accessible
through the communication passages
from the hall on two sides (apart from 11
th floor, where OST A and OST B exchange
station is located, and so the total number
of apartments on this floor is 11). Elevator
hall on the ground floor opens into
the foyer, which offers in addition also
a reception desk with permanent service.
The ground floor oriented towards
Bajkalská street and also east side with
pedestrian communication, offers, apart
from entrances to residential spaces also
spaces of facilities and services on the
area of approximately 3 728 m2. In addition
to the cellar, the house facilities are
enriched by spaces for the regeneration
of physical and psychic powers (fitness,
tabletennis)andpublicspaces(children´s
playrooms, large video room) for getting
into contact between inhabitants of the
house outside of corridors of individual
residential floors.
Garage house with 4 floors forms
a protective barrier against noise
exposure from Bajkalská street and on
green roof creates „elevated“ outdoor
leisure area for the residential part, which
will maintain its protective potential
also when considering the estimated
vertical alignment of elevated road of
the Bajkalská street in height of 7.5 m
from the current ground level. Despite
such barrier, it was necessary to protect
residential climate of individual flats
of 19th floor residential towers by
satisfactory facade with slotted noise-
absorbing ventilation while maintaining
effective protection against excessive
insolation, and attractive vistas of the
panorama of Bratislava with attractions of
the Old Town and the mountain backdrop
of the Small Carpathian Mountains on the
northwest side.
The bottom part of the complex is
designed as a garage object with one
underground floor, ground floor with
facilities and with three above-ground
garage floors. This part is covered with
a flat roof on the 5th floor level that
is already a part of the tower object
of elliptical floor plan. Due to higher
residential floors, the 5 above-ground
floor is shifted inwards by about 1.5 m
and connects the garage object with the
residential tower.
The main residential part of elliptical
tower building starts from the 6 th floor
and ends by maisonette apartments on
the 23rd and 24th floor.
The roof decks are designed as walking
terraceswithcontactlayerofconcrete,stone
pavement, wooden pallet from a durable
wood, or in a form of a semi-intensive
vegetation roof or extensive vegetation
combined with roof covered with gravel.
Residential complex III Veže (Three Towers)
Complex project management
http://www.floowie.com/sk/citaj/kamiprofit-aj/34 KAMI PROFIT
Elevator hall in the ground floor opens into the foyer, which in addition to
spatial standard also offers a reception desk with permanent service.
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 35
III Veže Residential Complex
III VEŽE RESIDENTIAL COMPLEX,
BAJKALSKÁ STREET, BRATISLAVA
Project management:
Milín Kaňuščák
Roman Jánoška
Ľuboš Kormaník
Project location:
Bratislava, Bajkalská street
Investor:
Development CRESCO, a. s., Panská 15,
811 01 Bratislava 1, GE Capital Golub
Europe, Quinlan Private
Author of architectural concept:
Martin Wolf, SCB & Associates, Inc.,
Chicago, USA
Author of architectural design:
Peter Moravčík
Contractor:
Chemkostav, a. s., Alpine Slovakia, s. r. o.
Construction commencement:
2006
Construction completion:
2009
Total investment:
€ 80 mil. excluding VAT
Activities of the KAMI PROFIT, s. r. o.:
Complex project management
http://www.floowie.com/sk/citaj/kamiprofit-aj/36 KAMI PROFIT
Social areas (children´s game rooms,
large video room) have the function of
maintaining contact between residents.
In addition to the cellar, the house facilities
are enriched by spaces for the regeneration
of physical and psychic powers (fitness, table
tennis).
Terraces, balconies and large windows
with lowered sills offer the residents of
each apartment an impressive view of
Bratislava.
Floor plan of a standard floor
Layout of structural design
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 37
Photos from the course of construction implementation
West, south and east view of the ground floor of the Tower I
Section A – A
III Veže Residential Complex
http://www.floowie.com/sk/citaj/kamiprofit-aj/38 KAMI PROFIT
Section B – B
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 39
Layout of maisonettes rooms
III Veže Residential Complex
http://www.floowie.com/sk/citaj/kamiprofit-aj/40 KAMI PROFIT
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 41
Alfa building
has completed
the neoplasm of
technology tract
construction. In the
exterior, the authors
have used concrete
mattress. The gray
letterings disturb
the black and white
visual of the objects.
Materials of high quality and design have their place in the Kulturpark.
Kulturpark is a new cultural centre, which was created by the reconstruction
of the former barracks. Original objects were complemented by new ones,
a centennial park has undergone revitalization and a new square was built up.
The originally closed, introverted and
for ordinary people inaccessible for-
mer military complex has become an
open public space that links two com-
plementary environments: a park and
a new square. The architectural design
respected the qualities of the existing
complex. The renovated buildings that
surround a park of centennial trees are
characterised by their clear organisa-
tion, geometrics, proportions and con-
structions. Furthermore the buildings
were enhanced with new functions and
activity opportunities. These opportuni-
ties as well as the new functions of this
complex and the entrance for new visi-
tors of this formerly closed area were
implemented purposefully and civilly as
they respect the original buildings and
the trees in the park.
The three main historical buildings that
were renovated with priority are connec-
ted by a network of eight new pavilions of
smaller proportions. Those pavilions form
a new architectural entity and serve as
expansion for the programs and activities
from the “stone“ buildings to the square
and the park. “The dialogue of the original
and historical with a new architectural lay-
er is what is the most is interesting,“ says
the architect, Irakli Eristavi.
A central object of the area is the
Alfa object – central building contai-
ning indoor spaces for cultural events,
concerts, theatre performances. These
halls are complemented by exhibitions
paces – gallery, café, administrative and
technical facilities. Bravo- support cen-
tre of culture and creativity is located
on the south-west edge of the area. This
building with four floors offers a space
for art studios, workshops, studios and
classrooms. Functional composition of
the object is complemented by entrance
spaces with reception, exhibition spaces,
a library for children and adolescents as
well as technical background of the ob-
ject. The House of a genuine culture fo-
cused on ethnographic research and folk
dance school should become a part of
the object in future. Charlie is the object
situated on the north-west edge of the
area. The four above-ground floors offer
space for Steelpark – permanent interac-
tive installation intended for education of
children and adolescents in science and
technology. New pavilions Papa, Novem-
ber, Echo, Lima, Foxtrot, Uniform, Oscar,
Delta, which are situated in the park and
in the square, have different functions,
serve for workshops as well as informa-
tion centre, café and accommodation for
artists on residential stays.
The arrangement of the new buildings
is predetermined by a grid pattern. This
grid is the architectural response to the
strict geometrical nature of the Austro-
-Hungarian military complex. The an-
swer to the system is just another sys-
tem.
The original buildings are like pieces
on a chessboard. They have their value,
graveness, in one word: they are of calib-
re. The new structure, a whole spectrum
of “pieces of low calibre“, fills new po-
sitions. The visual interconnectivity of
these pieces, the fact that they belong
to one and the same geometrical system
and their reciprocal resemblance pro-
vides uniqueness and identifiability of
the new within an old environment. The
whole project has a strong environmen-
tal flavour, especially concerning the
use of alternative energy sources and
low energy costs – this should increase
the sustainability of the new cultural and
social complex.
Kulturpark Košice
Complex project management
http://www.floowie.com/sk/citaj/kamiprofit-aj/42 KAMI PROFIT
The area of original Austro-Hungarian barracks from the 19th century
was successfully transformed into a multi-gender cultural centre.
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 43
Kulturpark Košice
RECONSTRUCTION
OF THE FORMER
BARRACKS – KULTURPARK
KOŠICE
Project management:
Peter Janega
Project name:
Košice, Kukučínova street
Investor:
Mesto Košice
Architect:
Irakli Eristavi, zero zero
Author´s cooperation:
Slivia Šillová,
Pavol Šilla,
Milan Vlček, zero zero
Contractor:
Doprastav, a. s.
Construction commencement:
July 2012
Construction completion:
15 July 2013, Final building approval
on 30 July 2013
Total investment:
€ 20,312,000.00 excluding VAT
Activities of the KAMI PROFIT, s. r. o.:
Complex project management
http://www.floowie.com/sk/citaj/kamiprofit-aj/44 KAMI PROFIT
Section of Bravo object
Twins outdoor seating made
by PPAG is a test of cultural
maturity of Kulturpark´s visitors
and residents of Košice.
The team of Irakli Eristavi has acquitted of
the former military spaces with an incredible
humility resulting in a clean modern spaces,
as if the architects have only swept up the
time deposits and delivered a chic of the 21 st
century.
Implementation of the building pit
Layout of aerial view of the area
1. Alfa – central building
2. Bravo – centre for culture and creativity
3. Charlie – Steel Park – exhibition
4. Delta – information pavilion
5, 6, 7. Echo, Foxtrot, Oscar – workshops
8. Lima – accommodation for artists
9. Kilo – underground parking garage
10. November – pavilion of art workshops
11. Papa – café
12. Uniform – safety checkpoint
13. X-ray – technical background
14. Yankee – urban pergola
15. Zulu – basic orientation point
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 45
Floor plan of Alfa building
Photos from the course of implementation
Charlie object: floor plan of the 1 st floor
and the longitudinal section
Kulturpark Košice
http://www.floowie.com/sk/citaj/kamiprofit-aj/46 KAMI PROFIT
Entrance square from Kukučínová street is habitated by various stages, urban pergola
or information and control points in the form of Delta, November and Uniform pavilions.
How was the implementation of the
project carried out?
The construction took one year. It
was extremely difficult, but also in-
structive. I often think about all the pe-
ople who stood by my side at the time
and did fight for the right thing. The
former centennial park in the area of
the former barracks has been comple-
mented by new white square. The squ-
are and the park – the new public space
in the city centre, is probably the grea-
test benefit to all inhabitants of Košice.
What would you have highlighted
fromtheproject,whatareyouproudof?
We managed an experiment with
white concrete of the square resulting
in clearly readable boundaries of our
intervention. The made-to-measure
street furniture equipment designed by
Viennese architects PPAG is also so-
mething exceptional and unique.
If you had no more than three
words to express the nature of the
construction and implementation,
what would it be?
Park, square, people.
Architect´s opinion: Irakli Eristavi
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 47
The west side of the built in construction
– cross section of entrance gate
OP4 A
Structure of external wall of the build in
construction above terrain
– the part above the plinth
Prefabricated reinforced concrete wall of C
25/30 concrete class with a thickness of 300
mm painted with a transparent protective
coating
Insulation – XPS polystyrene panels of
a thickness of 160 mm – ventilated air gap with
a thickness of 40 mm
architectural concrete panels with a vertical
structure of C 25/30 concrete class painted
with a transparent protective outer coating with
a thickness of 120 mm – anchoring system
designed for handing concrete facades
STRUCTURE OF EXTERNAL
CLADDING
The west side of the built in construction – cross section of entrance gate
Kulturpark Košice
OP4 B
Structure of external wall of the built in
construction above terrain – the plinth part
Prefabricated reinforced concrete wall of C
25/30 concrete class with a thickness of 300 mm
painted with a transparent protective coating
Contact thermal insulation system with thermal
insulation – bonded XPS polystyrene panels of
a thickness of 160 mm
Glass-textile grid, adhesive and reinforcing
material (materials and products belonging
solely to one thermal insulation system)
Finish: smooth high-build coating with cement
binder
http://www.floowie.com/sk/citaj/kamiprofit-aj/48 KAMI PROFIT
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 49
The new tunnel shall contribute to improving road safety
and flow of traffic, reducing the number of road accidents
and negative impacts on the environment.
The Ovčiarsko tunnel is part of the
D1 motorway being built in the section
Hričovské Podhradie – Dubná Skala. The
section in subject is part of the transport
corridor no. V being modified by branch
A in Slovakia, in the route Bratislava –
Trenčín – Žilina – Košice – border SR/
Ukraine. At the same time this section
is part of the main section of the D1 mo-
torway in Slovakia. At the moment, the
whole traffic in the section concerned
runs through roads I/18 and I/64. Since
the roads have largely unsatisfactory
safety and capacity parameters, this con-
dition causes more difficult manoeuvring
possibilities and limitation of the traffic
flow, increase of accident frequency and
the deterioration of the environment.
The construction is located in the
Žilina region, in the Žiina District and in
cadastral areas Hričovské Podhradie,
Dolný Hričov, Ovčiarsko, Bitarová,
Hôrky, Brezany, Bánová, Lietavská
Lúčka, Bytčica, Porúbka, Turie, Rosina,
Višňové and Vrútky. Construction starts
in the Váh valley by connecting to D1 and
D3 motorway on motorway intersection
in Dolný Hričov. By bridge object it goes
over the edge of the village Dolný Hričov
and the road I/18. It continues through
the top Briešky by Ovčiarsko tunnel, fur-
ther on the slopes of Biatrová stream
valley and by Žilina tunnel it enters the
Rajčianka valley and the village Lietavs-
ká Lúčka. It crosses this village together
with the road I/64 and Rajčianka stream
by elevated road and continues on the
east edge of Žilina basin. The route goes
through heights and difficult valleys in
the whole section, which have landslide
areas of various activities (from active
forms to stabilized landslides), therefore
the route is reinforced by anchor breast
walls or it is routed on bridge objects.
The section ends at the east portal of
the cadastral area Vrútky by branches of
Dubná Skala intersection with connec-
tion of D1 to I/18 road towards Martin
and from it.
Ovčiarsko tunnel is designed with two
parallel tunnel tubes in a length of 2,348
m and 2,353 m. The designed tunnel is of
the 2T– 8.0 category according to STN 73
7507 with one-way traffic. Three drive-
through cross connections and five cross
passages, which serve as protected es-
cape routes are part of the tunnel. Tunnel
excavation shall be carried out according
to the principles of NRTM – cyclical ex-
cavation. According to NRTM, the cyclical
excavation means an excavation when
immediately after excavation of the ex-
cavated material; all elements of primary
lining are built in according to pre-agreed
class. Cyclical excavation consists of
operating cycles, which are constantly
repeated: stabilization of excavation
face against the excavation, pre-driven
equipment; excavation itself and stabili-
zation of excavation. Tunnel tube will be
excavated in upraise way from the west
portal. Profile of the main tunnel tube
without emergency bays is horizontally
divided into top heading, bench and bot-
tom bench or invert. Each of these parts
is being excavated separately. Second-
ary lining of the tunnel is designed from
reinforced concrete by using concrete
C30/37-XF4, XC3 and C25/30-XF2, XC3
(inner section of the tunnel) with a thick-
ness of lining 0.3 m with an invert being
concreted into sliding lining. The steel
reinforcing bars of B 500 B class are de-
signed as the reinforcement.
Ventilation is longitudinal with jet fans
placed under the ceiling of the tunnel
tube. Eight cross connections were de-
signed in order to provide escape in case
of an accident, 5 connections for pedes-
trians and 3 connections for vehicles.
Excavation of the tunnel is being implemented by the method of cyclical excavation.
Ovčiarsko tunnel
Complex project management
Ovčiarsko tunnel is
designed with two
parallel tunnel tubes
in a length of 2,348 m
and 2,353 m.
http://www.floowie.com/sk/citaj/kamiprofit-aj/50 KAMI PROFIT
The tunnel excavation was officially launched by ceremonial placing
of St. Barbara statue on 12 September 2014 at the western portal.
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 51
Ovčiarsko Tunnel
Ovčiarsko TUNNEL
Project management:
Milín Kaňuščák
Peter Janega
Project name:
D1 Motorway Hričovské Podhradie
– Lietavská Lúčka
Project location:
Cadastral area Dolný Hričov, Ovčiarsko,
Žilina District
Investor:
Národná diaľničná spoločnosť,
Mlynské nivy 45,
821 09 Bratislava
General Contractor:
„Združenie Ovčiarsko“ consortium
Members of the Joint Venture:
DOPRASTAV, a. s., Bratislava
– leading member,
Váhostav – SK, a. s., Žilina,
STRABAG, s. r. o., Bratislava,
Metrostav, a. s., Praha
Tunnel designer:
Basler & Hofmann Slovakia, Panenská 13,
Bratislava
Responsible tunnel designer:
Róbert Zwilling
Tunnel excavation – NTT:
Róbert Zwilling,
Peter Bóna
Construction commencement:
June 2014
Construction completion:
2018
Total investment:
€ 91,200, 000.00 excluding VAT
Activities of the KAMI PROFIT, s. r. o.:
Complex project management
http://www.floowie.com/sk/citaj/kamiprofit-aj/52 KAMI PROFIT
Construction works at the eastern portal of the Ovčiarsko tunnel
Longitudinal profile no. 1 – beginning
of excavation of the eastern portal (EP)
Cross section B – B
Longitudinal profile no. 2 – lining implementation in an open pit at the EP
Cross section A – A
Longitudinal profile no. 3 – implementation
of tunnel inner lining – the EP
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 53
Construction works at the western portal of the Ovčiarsko tunnel
Longitudinal profile no. 1 – beginning
of excavation of the western portal (WP)
Cross section A – A
Ovčiarsko Tunnel
Longitudinal profile no. 2 – lining implementation in an open pit at the WP
Cross section B – B
Longitudinal profile no. 3 – implementation
of tunnel inner lining – the WP
http://www.floowie.com/sk/citaj/kamiprofit-aj/54 KAMI PROFIT
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 55
The Višňové motorway tunnel is part
of the D1 motorway being built in the
section Lietavská Lúčka – Višňové and
Višňové – Dubná Skala. The motorway
is part of the D1 Motorway - the border
Czech Republic/Slovak Republic and the
border Slovak Republic/Ukraine in the
section Lietavská Lúčka – Višňové and
Višňové – Dubná Skala. The construc-
tion is located in the Žilina region, in
the Žiina District and in cadastral ar-
eas Hričovské Podhradie, Dolný Hričov,
Ovčiarsko, Bitarová, Hôrky, Brezany,
Bánová, Lietavská Lúčka, Bytčica,
Porúbka, Turie, Rosina, Višňové and
Vrútky. Construction starts in the Váh
valley by connecting to D1 and D3 motor-
way on motorway intersection in Dolný
Hričov. By bridge object it goes over the
edge of the village Dolný Hričov and the
road I/18. It continues through the top
Briešky by Ovčiarsko tunnel, further on
the slopes of Biatrová stream valley and
by Žilina tunnel it enters the Rajčianka
valley and the village Lietavská Lúčka.
It crosses this village together with the
road I/64 and Rajčianka stream by el-
evated road and continues on the east-
ern edge of Žilina basin. The route goes
through heights and difficult valleys in
the whole section, which have land-
slide areas of various activities (from
active forms to stabilized landslides),
therefore the route is reinforced by
anchor breast walls or it is routed on
bridge objects. Dominant object of the
section is the Višňové twin-tube tunnel
with a length of 7,484 m below the mas-
sif Lúčanská Malá Fatra. The section
ends behind the eastern portal in the
cadastral area Vrútky by branches of
Dubná Skala intersection with connec-
tion of D1 to I/18 road towards Martin
and from it.
Višňové tunnel will be formed by two
tunnel tubes. The southern tunnel tube,
which will consist of two portals – the
eastern portal and the western por-
tal with the total length of 7,484 m. The
southern tunnel tube will also consist of
two portals – the western portal and the
eastern portal, whereas the total length of
the southern tunnel tube will be 7,520 m.
The tunnel will be built in open build-
ing pit – the western portal includes the
section from the portal wall, where the
structure is being connected to mined
tunnel, up to definitive portal, with the
fact that in one part the tunnel tube pass-
es in the open space (free standing un-
covered tunnel tube), it means, from the
portal to the excavation up to the building
– length of 10 m for the northern tunnel
tube and 10.65 m for the southern tun-
nel tube and in the second part it passes
through a building (length of 24.6 m).
Free standing definitive portal is behind
the exit from the building. The tunnel will
be built in open building pit – the east-
ern portal includes the section from the
portal wall, where the structure is being
connected to mined tunnel, up to defini-
tive portal, with the fact that in one part
the tunnel tube passes in the open space
(free standing uncovered tunnel tube), it
means, from the portal to the excavation
up to the building – length of 10 m for the
northern tunnel tube and 6,307 m for the
southern tunnel tube and in the second
part it passes through a building (length
of 24.6 m). Similarly to the western por-
tal, the free standing definitive portal is
behind the exit from the building. The
tunnel will be driven using the NATM
method, whereas it concerns the exca-
vation according to support classes with
divided tunnel face (top heading, support
part, bottom and embankment for face
stabilization). The lining is divided into
arch, wall and invert.
Ventilation system will be transversal,
the outlet and inlet of air will be above
the ceiling board ensuring the air to be
blown and extracted by air channels.
Ventilation consists of three sections,
whereas in the 1 st and 3 rd sections it is
provided through portal buildings of EP
and WP and the 2 nd section is provided
through the ventilation shaft. Ventilation
shaft is 102 m high and outlets on the
ground. In order to ensure the exit in
case of an accident, 13 cross passages
for escape of pedestrians and 12 cross
passages for vehicles were designed.
Geological conditions necessitated different
approaches for the stabilization of excavations.
The section of D1 Motorway Lietavská Lúčka – Višňové and Višňové
– Dubná Skala is located in the large territorial unit of the Žilina Self-
governing Region, which according to its traffic load has been one of
the most loaded transport routes in Slovakia.
Višňové Tunnel
Complex project management
http://www.floowie.com/sk/citaj/kamiprofit-aj/56 KAMI PROFIT
Portal parts are carefully integrated into the landscape creating
interesting dominating feature.
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 57
Višňové Tunnel
VIŠŇOVÉ TUNNEL
Project management:
Peter Janega
Milín Kaňuščák
Róbert Čorba
Ľuboš Kormaník
Project name:
D1 Motorway Lietavská Lúčka – Višňové –
Dubná Skala
Project location:
Žilinský Region, Žilina District, Martin,
Municipalities:
Lietavská Lúčka,
Žilina – Bytčica, Porúbka,
Turie, Rosina, Višňové, Lipovec, Vrútky,
Turčianske Kľačany
Investor:
Národná diaľničná spoločnosť,
Mlynské nivy 45,
821 09 Bratislava
Contractor of documentation:
Geoconsult, s. r. o.,
Miletičova 21, 820 05 Bratislava
Terraprojekt, a. s.,
Podunajská 24, 821 06 Bratislava
RockSoil S. p. A. Milan, Italy
Ferro, Italy
Chief Engineer:
Ondrej Kupčo
Contractor:
SALINI IMPREGILO S. p. A., DÚHA, a. s.
Commencement of works:
June 2014
Completion of works:
December 2019
Total investment:
€ 410 mil. excluding VAT
OBJECTS
Intersection:
Lietavská Lúčka, Dubná Skala
– not completed
Elevated road:
7 bridges
Tunnel:
Višňové (7,520 m)
Resting area:
Turie (large, left sided)
Maintenance Centre Žilina
Activities of the KAMI PROFIT, s. r. o.:
Complex project management
http://www.floowie.com/sk/citaj/kamiprofit-aj/58 KAMI PROFIT
Lietavská Lúčka – Višňové section
D1 Motorway Lietavská Lúčka – Višňové, longitudinal profile
D1 Motorway Lietavská Lúčka – Višňové, coordination construction drawing 3,415 – 4,504 km
Photos from the course of implementation
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 59
Višňové – Dubná Skala section
Longitudinal profile – the northern tunnel tube Longitudinal profile – the southern tunnel tube
Layout – the western portal Layout – the eastern portal
Višňové Tunnel
Photos from the course of implementation
http://www.floowie.com/sk/citaj/kamiprofit-aj/60 KAMI PROFIT
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 61
Urban Industrial
and Technological
Park in Trnava
includes pavilion for
storage and logistics
that contains
spaces mainly for
production and
storage purposes.
Space for sophisticated technology and production.
The project intention was not only to implement the
revitalization of the industrial park, but also to attract new
investments in order to create jobs in the Trnava region.
Project of TTIP – Trnava Industrial
Park was based on strategic develop-
ment plan of the city with the aim to offer
top quality facilities to potential investors
active in the field of research, develop-
ment, design, production and testing of
new prototypes. This kind of activities
require much more than high quality
transport infrastructure and available
employment opportunities, which have
been an essential condition for the arrival
of investors, particularly from the area of
assembly. In addition to office space, the
tenants are provided with other services
mainly in the field of preparation and im-
plementation of projects under the EU
funds, as well as joint training activities
of their employees. The project was fi-
nancially supported through grants from
the Operational Programme Competiti-
veness and Economic Growth, Measure
1.2 Support of common services, sub-
-measure: Support for the building of
brown industrial parks, code of a call::
KaHR-12VS-0801.
The overall objective of the project was
to implement the revitalization of brown
industrial park, which was an urban in-
dustrial area on Priemyselná street no.
5 in Trnava, in order to modernize and
reconstruct the part of the area in sub-
ject and build a modern space facilities
for business entities and organizations
acting in the field of industrial produc-
tion, sophisticated technologies, and de-
veloping activities, thereby creating not
only the spatial possibilities for business
needs, but also to promote the compe-
titiveness and innovative potential of
small and medium enterprises in the city
of Trnava and in the Trnava Self-gover-
ning Region. At the same time, it was an
intention of the city to attract high tech-
nology-oriented investments through
quality spatial possibilities, which would
create high-skilled jobs in Trnava and in
the Trnava region. Various support ser-
vices and ties to training, research and
development processes in the Faculty
of Materials Science and Technology in
Trnava and other universities are provi-
ded to all companies established in the
Urban Industrial and Technological Park
Trnava through the First Automotive
Cluster – West Slovakia.
The reconstruction and moderniza-
tion was carried out since October 2009
to February 2012 on the area of nearly
29 000 m2 of former grounds of technical
services for the city:
Pavilion of sophisticated production
and pavilion of production units desig-
ned for innovative companies engaged
in the sophisticated production and
light technological production com-
plemented by smaller storage spaces
Production and technology pavilion
consisting mainly of factory hall and
smaller areas suitable for manufactu-
ring and office purposes
Storage pavilion offering mainly space
for storage purposes
Storage and logistics pavilion inclu-
ding spaces mainly for production and
storage purposes.
Overall 7,479.4 m2 of office space is
available for business purposes in the
technological park. Communications
inside the grounds, as well as other uti-
lities were completely replaced and mo-
dernized reaching increased safety. Bu-
siness entities have on disposal 1 500 m2
of parking areas in the whole grounds.
The park is constantly monitored by
CCTV and security service. Reception
service is provided in the administrative
and production spaces.
Industrial and Technological Park in Trnava
Complex project management
http://www.floowie.com/sk/citaj/kamiprofit-aj/62 KAMI PROFIT
Overall 7,479.4 m2 of office space is available for business
purposes in the technological park.
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 63
URBAN INDUSTRIAL
AND TECHNOLOGICAL PARK
TRNAVA
Project management:
Milín Kaňuščák
Roman Jánoška
Peter Janega
Project location:
Priemyselná ulica č. 5, Trnava
Investor:
Mesto Trnava
Chief Architect of the project:
Jozef Ďurko,
Pavel Ďurko
Elaborator of architectural study:
Branislav Loskot,
Jaroslav Takáč,
Peter Kukučka
General designer:
RH Dúha, s. r. o., Čapajevova 29,
080 01 Prešov, Viliam Mikláš
Designer:
Ateliér DV, s. r. o., Hornopotočná ul. č. 20,
917 00 Trnava
General supplier:
Dúha, a. s. – Trnavská stavebná
spoločnosť, a. s.
Commencement of works:
October 2009
Completion of works:
February 2012
Total investment:
€ 10 million excluding VAT
The activity of the company
KAMI PROFIT, s. r. o.:
Complex project management for the
general supplier of construction
and engineering
Industrial and Technological Park in Trnava
http://www.floowie.com/sk/citaj/kamiprofit-aj/64 KAMI PROFIT
Section A – A
Restaurant, which offers daily menu Sanitary facilities
Layout
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 65
Section F – F
Aerial photograph of the area Storage and logistics pavilion
Schematic layout of construction objects
SO 01A – pavilion of sophisticated production
SO 01B – production and technological pavilion
SO 01C – storage and logistics pavilion
SO 02 – pavilion of production units
SO 03 – storage pavilion
PO 01 – administrative building
PO 02 – administrative building
PO 03 – garages
PO 04 – garages
PO 05 – garages
PO 06 – former service station
PO 07 – workshops and warehouses
Industrial and Technological Park in Trnava
http://www.floowie.com/sk/citaj/kamiprofit-aj/66 KAMI PROFIT
Section B – B Section C – C Section D – D Section E – E
Entrance reception desk
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 67
Coordination drawing
Industrial and Technological Park in Trnava
http://www.floowie.com/sk/citaj/kamiprofit-aj/68 KAMI PROFIT
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 69
Foundation base is formed by prefabricated steel frame structure.
The industrial object of the company Polyvlies serves
for the production of non-woven fabrics, which are
used as sound insulation in the automotive industry.
Technological process of producing
non-woven fabrics begins by unwrap-
ping of input material – textile fibres,
which are imported in a form of tufts in
packs. The processing consists of mix-
ing, milling, mechanical stretching, ther-
mal bonding and drying of textile fibres.
The quantity of processed raw material is
about 1.5 tons per day.
The Polyvlies object is divided into two
parts (stages); the production hall with
an area of 2, 500 m2 with social and ad-
ministrative facilities, and the warehouse
hall with an area of 2,800 m2. The pro-
duction and warehouse hall is designed
with modulation of 6 m and span of 36 m.
The production part consists of eleven
modules and the storage part of fourteen
modules. Free flexible space of steel
hall and industrial flooring with the re-
quired load capacity enabled the desired
variability of technology arrangement. A
part of the hall is equipped with a 1.2-ton
bridge crane. There are also complete
utilities (transformer station, MV con-
nection, water supply, sewerage, ORL,
paved areas and roads, public lighting,
etc.) in the main building. Part of the
first phase was also the construction
of engineering facilities – water supply,
sewerage, fire water pipeline, drainage
and infiltration of area, MV distribution
system and transformer station, LV dis-
tribution system, telephone connection,
gas pipeline, lighting of the area, paved
areas and roads, as well as ground shap-
ing and landscaping adjustments.
After successful completion of the
first phase and legally valid final build-
ing approval of 2,500 m² hall (including
administrative part) in April 2013, and
engineering facilities in June 2013, the
implementation of the second phase has
began, which consisted of the construc-
tion of storage hall with an area of 2,800
m² and enlargement of administrative
part with an area of 220 m² including
engineering objects. The production and
warehouse hall are implemented from
prefabricated steel frame structure with
a span of 36 m and with module of 6 m,
whereas the walls are implemented from
horizontal sandwich mineral panels and
the roof of the LPR system (mineral wool
and trapezoidal sheet). Daily lighting is
provided via central skylight and win-
dows. The administrative part is imple-
mented from ceramic bricks, including
contact thermal insulation system and
drywall structures. The vertical bear-
ing structures are formed by reinforced
concrete slab and the second floor by a
steel one.
Polyvlies Sereď
Complex project management
Part of the hall
is equipped with
a 1.2-ton bridge
crane.
http://www.floowie.com/sk/citaj/kamiprofit-aj/70 KAMI PROFIT
The first stage of construction
Drawing of used welded parts
Situation
PRODUCTION OF NON-WOVEN
FABRICS
Polyvlies 1st and 2nd phase
Project management:
Ľuboš Kormaník
Roman Jánoška
Project location:
Sereď
Designer:
ProVia, s. r. o. – Projektovanie dopravných
Stavieb, Lomonosovova 6, 918 54 Trnava,
Ing. arch. Robert Kráľ
Commencement and completion of the 1st
stage of the construction (Production hall):
November 2011 to June 2012
Commencement and completion of the 2nd
stage of the construction (Warehouse hall):
June 2013 to March 2014
Total investment of the 1st stage:
€ 1.5 mil. excluding VAT
Total investment of the 2nd stage:
€ 1.3 mil. excluding VAT
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 71
Structure and anchoring
of horizontal mineral
sandwich panels
The second stage of construction
Roof structure
Activities of the KAMI PROFIT, s. r. o.:
Complex project management
Complete tendering process – from prepara-
tion of the tender documents up to the signing
of contracts
Communication with the building authority –
from the change of the construction before its
completion to the final building approval
Communication with the authorities concerned
Design and approval of technical alternatives
and value engineering
Checking the quality of the works provided by
subcontractors
Management of control and coordination days
Labour safety monitoring
Coordination of subcontractors
Checking the implementation within the mea-
ning of approved design documentation
Approving the monthly statements of subcon-
tractors
Hand-over of the works to the investor inclu-
ding all documents and tests required for the
hand-over of a serviceable works
Participation in the final building approval
process
Polyvlies Sereď
http://www.floowie.com/sk/citaj/kamiprofit-aj/72 KAMI PROFIT
One of the latest projects is providing
construction management services (investment
projects) implemented in the chain of fuel
stations of the company SLOVNAFT, a. s.
Within the framework of providing
construction management services im-
plemented in the chain of fuel stations
of SLOVNAFT, a. s., the modernization
of fuel station in Lučenec – Opatová
shall be held. The following works are
planned:
– partial reconstruction of buildings –
kiosk building reconstruction (shop)
and RVI replacement, reconstruction
including a change of building´s dis-
position, reconstruction of toilet faci-
lities (including a change of dispos-
ition), reconstruction of the heating
system in the fuel station;
– other reconstructions – reconstruc-
tion of walls, foundations, roads, pa-
vements and so on, (permits are not
required), change of fuel dispensers,
change of disposition – transport so-
lution, reconstruction of manipulation
areas when fuelling and tapping off
of fuels, reconstruction of pipelines,
reconstruction of external drainage
system, reconstruction of external
utilities, public lighting and so on.
Project name:
The provision of construction
management services
(investment project) implemented
in the chain of fuel stations
of the
company SLOVNAFT, a. s.
Project managers:
Pavol Hayden
Štefan Litomerický
Roman Jánoška
Investor:
SLOVNAFT, a. s., Vlčie hrdlo 1,
824 12 Bratislava
Project location:
Fuel station in Lučenec – Opatová
Type of construction:
Reconstruction of fuel station
Lučenec – Opatová
Designer:
APROVING, s. r. o., Ing. Roman Vaľo
Construction commencement:
March 2015
Construction completion:
September 2015
Fuel station, Lučenec
Realized project
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 73
Activities of the KAMI PROFIT, s. r. o.:
Construction supervision, project mana-
gement
Visual inspection of the fuel station
with the designer and the client during
the project assignment
Checking of the project for building
permit
Checking the compliance of the scope
of design from the designer with the
requirements of the client
Checking the implementation and the
project for demolition
Hand-over of the site
Construction supervision performance
(coordination, checking of the
investment, cooperation with the
client, regular reporting, convening of
control days)
Management of additional/extra
works that have occurred during the
construction
Organization of acceptance of
the construction, the acceptance
procedure
Applying and handling claims on
behalf of the client
Fuel station, Lučenec
Photos from the course of implementation
http://www.floowie.com/sk/citaj/kamiprofit-aj/74 KAMI PROFIT
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 75
Visual detailed
design of the
interior furnishings
was prepared
prior to the
implementation.
Modern systems have found space, too.
The Wüstenrot Building Society offers a wide range of products of life
and non-life insurance for both citizens and organizations. Its branch
office is located on Grösslingová Street 77 in Bratislava.
In May 2013, the premises on the 1st
floor, serving for contact with clients, un-
derwent overall modernization. The im-
plementation was exactly planned in ad-
vance and coordinated in individual steps
and sequences. A material, installation,
technical and technological equipment,
as well as elements and furnishings
were designed in detail and in advance
and their selection was approved by the
Investor. This ensured the continuous
progress of the reconstruction works.
There was a problem with the cohesion
of the coating under the original floor
tiles during the construction, because the
new floor tiles had been already delivered
from the warehouse and we, as the Con-
tractor, wanted to meet the deadline for
completion of the works, therefore we
decided to proceed with remediation of
sub base by using the Schulter system,
specifically by the Schluter ditra separat-
ing insulation ensuring the dilatation of
the original base coating from the new
large format floor tiles. All other works
were carried out in accordance with the
implementation plan.
Modernization of the Wüstenrot
branch office
General supplier
http://www.floowie.com/sk/citaj/kamiprofit-aj/76 KAMI PROFIT
Gray-red colour combination in the interior corresponds to
the colours of the Wüstenrot Building Society “brand“.
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 77
MODERNIZATION OF THE
WÜSTENROT BUILDING
SOCIETY´S BRANCH OFFICE
BRATISLAVA
Project management:
Roman Jánoška
Pavol Hayden
Investor:
Wüstenrot stavebná sporiteľňa, a. s.,
Grösslingová 77,
824 68 Bratislava
Project location:
Building, registration no. 5165 built on the
plot no. 9081/3, located in the cadastral area
of the Old Town, District of Bratislava I
Designer:
s_form., spol. s r. o., Studenohorská 27,
841 03 Bratislava, architect: Juraj Šimek
Commencement of works:
24 May 2013
Completion of works:
14 June 2013
Total investment:
€ 91,700.00 excluding VAT
Activities of the KAMI PROFIT, s. r. o.:
General supplier
Complete tendering process – from the
preparation of the tender documents up to the
signing of contracts with subcontractors
Design and approval of technical alternatives
Checking the quality of the works provided by
subcontractors
Labour safety monitoring
Coordination of subcontractors
Approving the monthly statements of
subcontractors
Hand-over of the works to the investor
including all documents and tests required for
the hand-over of a serviceable works
Modernization of the Wüstenrot
http://www.floowie.com/sk/citaj/kamiprofit-aj/78 KAMI PROFIT
Disposition
Modernization of the Wüstenrot
Visualization of layout
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 79
Spaces after reconstruction
New layout Elevator after complete reconstruction of the building
A large reconstruction can be implemented also in an
extremely short time. The connection of two rooms in
adjacent buildings on the 6th floor in the building of the
former Wüstenrot on Karadžičova Street proves it.
The project solves connection of
two adjacent buildings belonging to
the investor. Construction works were
implemented in a very short and in-
terlinked periods, which were directly
coordinated on the spot in order to li-
mit the workers of the Investor for as
little time as possible. It all began with
the moving of furniture and office equ-
ipment followed by dismantling works
concerning partition brick wall, sheet
metal suspended ceilings, floor cove-
rings, cutting a hole between buildings
of 30 + 30 cm thickness into reinforced
concrete wall for new connecting fire
doors. A new gypsum wall was built,
and the wiring was also modified. The
premises being reconstructed were
painted, a new suspended ceiling was
installed including new lighting; a new
office carpet was placed. Finally, the
assembly of the former door frames
and doors was carried out.
CONNECTION OF THE ROOMS
6.11 A AND 6.18 ON THE 6 TH FLOOR
Investor:
Wüstenrot poisťovňa, a. s.,
Karadžičova 17, 825 22 Bratislava
Project location: Karadžičova 17,
Grösslingová 77, Bratislava
Designer: s_form., spol. s r. o.,
Studenohorská 27, 841 03 Bratislava,
Architect: Juraj Šimek
Commencement of works:
15 February 2013
Completion of works: 25 February 2013
Total investment:
€ 16,000.00 excluding VAT
Activities of the KAMI PROFIT, s. r. o.:
General supplier
Complete tendering process – from preparation of
the tender documents up to the signing of contracts
with subcontractors
Design and approval of technical alternatives
Checking the quality of the works provided by sub-
contractors
Labour safety monitoring
Coordination of subcontractors
Approving the monthly statements of subcontractors
Hand-over of the works to the investor including all
documents and tests required for the hand-over of
a serviceable works
Building of the Wüstenrot, 6th floor
General contractor
http://www.floowie.com/sk/citaj/kamiprofit-aj/80 KAMI PROFIT
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 81
With the consent of the Regional Monuments Board, the external
structure of superstructure was covered into attic of folded sheet metal
and other functional layers of the external cladding.
The building of former Kožatex on
Grösslingová street no. 62 is part of the
heavily built-up street block defined by
Grösslingová, Dostojevského rad and
29. Augusta streets in the central city
district of Bratislava on the main city
radial road. According to preserved do-
cuments, it is estimated that the object
was put into use in 1958. Further con-
struction works were carried out in 1989
– extension of the 6 th floor with elevator
and elevator shaft on the roof of the buil-
ding, and in 1996 – general repair of the
boiler room including technology. The
company Wüstenrot bought the building
in 2009.
The original building was completely
reconstructed, giving rise to a building
with modern features and technologies,
whereas it was managed to retain the
charm of the past. From the original-
ly fully furnished (except furniture and
production equipment) administrative
and production building of the company
Kožatex, we dismantled all installations
of central heating starting from the boi-
ler room technology and ending with he-
ating technology, ventilation technology
and cooling, electrical installations in-
cluding fixtures and terminal elements,
original sanitary furnishings, ceramic
wall and floor tilling, cladding floor co-
verings , dividing interior structures and
original ceilings. As part of the recon-
struction, the replacement of original
windows by a new aluminium ones with
high thermal insulation properties was
carried out as well as additional insu-
lation of the roof structure, insulation
and renovation of the entire facade, so
that the original costly building would
become a low-energy to passive buil-
ding for the needs of supplied energies
with the energy certificate B. External,
but also internal design meets the high
demands on appearance as well as easy
maintenance. All spaces of administrati-
ve building are heated and cooled using
automatic control. The newly designed
and developed social facilities are im-
plemented in a higher standard than the
typical one for administrative buildings
of the capital. The original inconvenient
passenger lift was replaced by a new
one in the building. Existing inconsis-
tent plasters are replaced by a new pa-
tent plaster in combination with drywall
partition structures and ceilings. Floor
coverings are implemented to meet the
demands and ideas of the investor and
future tenants. Newly designed instal-
lations created a comfortable space for
work – administrative section as well as
for relaxation – café on the ground floor.
Reconstruction of the Kožatex building
The investor has finally changed
his original intention to renovate
the building for living due to
unsuitable orientation of a facade
to Grösslingová street and almost
insoluble static transport.
Comfortable space for work
as well as relax.
General supplier
http://www.floowie.com/sk/citaj/kamiprofit-aj/82 KAMI PROFIT
The café and entrance spaces are on the ground floor; the second
to fourth floor are used by the owner and the office spaces
for rental purposes are placed on the remaining floors.
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 83
Reconstruction of the Kožatex building
RECONSTRUCTION OF THE KOŽA-
TEX ADMINISTRATIVE BUILDING
Project management:
Roman Jánoška
Pavol Hayden
Project location:
Karadžičova 17, Grösslingová 77, Bratislava
Investor:
Wüstenrot poisťovňa, a. s., Karadžičova 17,
825 22 Bratislava
Designer:
s_form., spol. s r. o., Studenohorská 27,
841 03 Bratislava,
Architects: Juraj Šimek, Martin Šimek
Commencement of works:
24 May 2013
Completion of works:
19 November 2013
Total investment:
€ 1.5 mil. excluding VAT
Activities of the KAMI PROFIT, s. r. o.:
General supplier
Complete tendering process – from the
preparation of the tender documents up to the
signing of contracts
Proposal and approval of technical alternatives
Checking the quality of the works provided by
subcontractors
Labour safety monitoring
Approving the monthly statements of
subcontractors
Hand-over of the works to the investor
including all documents and tests required for
the hand-over of a serviceable works
http://www.floowie.com/sk/citaj/kamiprofit-aj/84 KAMI PROFIT
A view of the reconstructed facade W café serves not only for employees
of Wüstenrot building society, but
also for the public.
Kožatex building during
the reconstruction
Ground plan of the 1st floor Ground plan of the 2nd floor
Section A – A, south-eastern view Section B – B, western view
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 85
Photos from the course of implementation
North-western view North-eastern view Eastern view
What was the original intention of
the investor and how did the project
further develop?
The building of Kožatex is one of se-
veral objects in the area belonging to
the Client´s portfolio. Its modernization
has been carried in my and the Client´s
head for several years. The first ideas
were on paper in 2010. The owner ori-
ginally wanted to renovate the building
for living. However, the problem was
the inappropriate facade orientation to
Grösslingová Street and almost inso-
luble static transport. This plan was not
carried out. The project started to be
real again with a need to expand the sto-
rage capacity of the company. The 2nd
and 3rd aboveground floors became the
core ones of the project. The investor in-
tended to establish register offices and
archive in these spaces. The paper car-
rying capacity of ribbed floors, on which
the shelves were suppose to be placed
in future, was 600 kg/m2, the require-
ment for carrying capacity of ribbed flo-
ors under the shelves was 1,500 on the
2nd aboveground floor and 1,000 kg/m2
on the 3rd aboveground floor. After re-
moval of lower ceilings – veneers of flo-
or slabs, it was clear that the figures gi-
ven in the original documentation had to
be taken with reserve. The quality of the
implementation of the original building
was miserable and it was necessary to
propose appropriate static measures.
We suggested to reinforce the ceilings
under the future archive by carbon la-
mellas. During the implementation of
construction, the investor accepted the
proposal of the contractor to reinforce
the ceilings above the 1st and 2nd floor
by inserting steel beams.
How do you assess the activity of
the company KAMI PROFIT, s. r. o. as
the contractor of the construction?
Construction works of the building
were demanding for coordination in
straitened conditions of the site, in view
of the architect they were standard, and
the contractor approached them with
a high level of professionalism. The
benefit of building´s modernization in
comparison with the original condi-
tions is evident. We included the par-
ticipation in its reconstruction in our
portfolio.
Opinion of Architects: Juraj Šimek, Martin Šimek
Reconstruction of the Kožatex building
http://www.floowie.com/sk/citaj/kamiprofit-aj/86 KAMI PROFIT
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 87
Reconstruction
shall strengthen
relationships with
the customers and
contribute to the
attractiveness of
services.
Pleasant environment thanks to the quality concept.
The fuel station SHELL Červeník in direction from Piešťany
to Bratislava on the D1 motorway has acquired very
interesting folk tinge after the reconstruction.
The company SHELL operates 82
fuel stations in Slovakia. In an effort to
strengthen the relationship with cus-
tomers and improving the attractive-
ness of customer service, the company
decided to reconstruct individual fuel
stations. The SHELL Červeník 1 fuel
station is located on the left motorway
resting area Červeník next to D1 motor-
way in the direction of Bratislava. Due
to its position, the fuel station is daily
attended by a large number of custom-
ers using the services provided by the
station. The Investor decided to invest
into reconstruction of sanitary facilities.
The reconstruction included a change of
tiles, floor tiles, and ceilings, delivery of
new door, toilet cabins, sanitary equip-
ment, wallpaper, sanitary facilities and
reconstruction of sanitary engineering,
ventilation system, air conditioning and
electrical installations. In addition to the
reconstruction of sanitary facilities, the
facade insulation of the building was
also implemented using contact ther-
mal insulation system as well as the re-
construction of paved areas around the
fuel station. The reconstruction of paved
areas consisted of the change of asphalt
layer, interlocking pavement and curbs.
Fuel station SHELL Červeník
General supplier
http://www.floowie.com/sk/citaj/kamiprofit-aj/88 KAMI PROFIT
SHELL Červeník is a proof that a fuel station doesn´t have to
represent an austere space and can provide a cultural experience.
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 89
Fuel station SHELL Červeník
FUEL STATION
SHELL ČERVENÍK
Project management:
Ľuboš Kormaník
Alexander Halža
Investor:
SHELL Slovakia, Einsteinova 23,
851 01 Bratislava
Project location:
Cadastral area Červeník, Hlohovec District
Construction commencement:
November 2014
Construction completion:
December 2014
Total investment:
€ 223,000.00 excluding VAT
Activities of the KAMI PROFIT, s. r. o.:
General supplier
Complete tendering process – from
preparation of the tender documents up to the
signing
of contracts with subcontractors
Communication with the authorities concerned
Design of technical alternatives
Communication with investor
Checking the quality of the works provided by
subcontractors
Labour safety monitoring
Coordination of subcontractors
Approving the monthly statements of
subcontractors
Hand-over of the works to the investor
including all documents and tests required for
the hand-over of a serviceable works
http://www.floowie.com/sk/citaj/kamiprofit-aj/90 KAMI PROFIT
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 91
In terms of energy saving,
a combination of gas boilers
and heat air-water pump is
designed as the heat source,
which is placed on the roof.
Dubnička V. apartment building is designed for living. It shall be part of a larger
complex, which should contribute to the attractiveness of the surrounding area.
The apartment building is situated in
Bánovce nad Bebravou on the plot no.
790/5. Easily accessible public facilities
and the main transport of Svätopluková
Street are nearby the construction. The
land borders with the river Bebrava that
is separated by a dam. The location is at
the foot of Strážovské hills at an altitude
of 216 meters and it is situated on the
main line connecting the artery between
the central Slovakia and Moravia. The
build-up area not only continuously fol-
lows the original public facilities of the
town, but creates ideal conditions for its
development. Cultural life following the
rich cultural traditions, sports facilities,
agro-tourism centres and recreational
areas are at a stage of rapid develop-
ment. The standard needs of new inhab-
itants and the old settlers in the vicinity
will be covered by situating new small
business and operational units.
The architect, Matej Brašeň, was
contacted by the Investor for process-
ing architectural study of an apartment
building of rental apartments of regular
standard localized in Bánovce nad Be-
bravou in 2013. “In terms of functional
use, the territory under design (plot no.
790/5) was situated in a very convenient
location for the mentioned construc-
tion. Not far from the city centre, close
to the public facilities, as well as, in very
interesting natural area bordering the
river Bebrava. This location was chosen
by the representatives of Bánovce nad
Bebravou for the construction of sev-
eral apartment buildings long time ago.
However, the project has been suspend-
ed after the construction of one of the
small apartment building,“ says Matej
Brašeň. Situating of the construction
was also affected by the layout solution,
which was adapted to the cardinal points
orientation, and the light-technical con-
ditions.
The Investor requested to design
44 apartment units, mostly two-room
apartments. “After incorporation of all
requirements of the Investor and taking
into consideration all limiting factors,
I designed a longitudinal four-storey
corridor-type apartment building with
apartments oriented to the northeast
and southwest“, explains M. Brašeň.
In order to improve the proposal from
a technical and financial point of view,
the building is designed axially symmet-
rical, and it is divided by dilatation in the
place of the axis. The public facilities to-
gether with eight apartments are located
on the 1 st floor. The 2nd and 4th floors
are identical, each with 12 apartments.
From the architectural point of view, the
construction is simple, communicating
with existing apartment building. Regu-
lar longitudinal shape is made especial
by shifting of parts of the mass.
Suppression or highlighting of shifted
mass is solved by coloured facades.
Special elements of the simple archi-
tecture are balconies. The Investor has
welcomed the simplicity of the proposal
in terms of architecture. Mainly due to
economic point of view, simplicity of
technical solution related to subsequent
implementation as well as from, for ex-
ample, thermal, technical and energy
saving point of view. In terms of energy
saving, a combination of gas boilers and
heat air-water pump is designed as the
heat source, which is placed on the roof.
For preparation of project for build-
ing permit and subsequently also the
implementation of the project, Mr. Matej
Brašeň contacted the company NED At-
elier, s. r. o., with which he has cooper-
ated already several times in the past.
“I appreciate the cooperation with the
company and individual professionals
and consider it as very good,“ M. Brašeň
justified its decision.
Not very suitable conditions of the
foundation represented the main compli-
cation during the design. Since the area
is close to the river Bebrava, it was nec-
essary to found the construction on piles.
Another complication was the drainage
of rainwater from the apartment building
as well as from paved areas into the river
Bebrava, because the level of the river
fluctuates and is quite high towards the
surroundings.
Dubnička V. Apartment buildings
The Investor has welcomed the simplicity
of the design in terms of architecture.
Supplier of construction works
http://www.floowie.com/sk/citaj/kamiprofit-aj/92 KAMI PROFIT
Natural phenomenon has always been a determining factor
in situating the buildings and creating new residences.
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 93
Dubnička V. apartment building
DUBNIČKA V. APARTMENT
BUILDINGS,
BÁNOVCE NAD BEBRAVOU
Project management:
Pavol Hayden
Roman Jánoška
Jozef Kormaník
Project location:
Bánovce nad Bebravou, Svätoplukova
street, plot no. – 790/5
Investor:
Texo partner, a. s., Grösslingová 77,
824 68 Bratislava
Architect:
Matej Brašeň, authorized architect
2081 AA, J. Švermu 406,
966 01 Hliník nad Hronom
Designer:
Zoltán Belokostolský,
NED Atelier, s. r. o.,
Štefánikova 29,
811 05 Bratislava
Commencement of works:
15 April 2014
Completion of works:
23 December 2014
Total investment:
€ 1,075,000.00 excluding VAT
Activities of the KAMI PROFIT, s. r. o.:
Higher supplier of the construction
Complete tendering process of the construc-
tion part including ZTI, distribution and
terminal devices of central heating
Design and approval of technical alternatives
Checking the quality of the works provided by
subcontractors
Labour safety monitoring
Coordination of subcontractors and direct
supplies of the investor
Approving the monthly statements of subcon-
tractors
Hand-over of the works to the investor inclu-
ding all documents and tests required for the
hand-over of a serviceable works
Activity during the final building approval pro-
cess
Supplier of construction works
http://www.floowie.com/sk/citaj/kamiprofit-aj/94 KAMI PROFIT
Floor plan of the 1st floor
Layout
Special elements of the simple architecture
are balconies.
Technical background of the apartment building
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 95
Dubnička V. apartment building
What factors play an important
role in order to implement the works
to the satisfaction of the author as
well as the investor?
The most important factor is the com-
munication, with regard to proficiency
and also regularity. It is appropriate when
an investor has some experience with the
type of construction. Regular feedback
from the investor during the design pro-
cess is what speeds the process for the
author. Consequently, it is important to
find a common language regarding the
quality of architecture, quality of techni-
cal solution, used materials and financial
volume allocated to the construction
Is it difficult to meet the
Investor´s ideas, whether in terms of
the material, shape or finances?
It is difficult, of course. What is im-
portant is the mentioned communi-
cation and mainly what the Investor
wants to achieve with the construction.
Whether, in addition to the financial
terms, it also concerns a benefit for
residents, the city and in general for
the quality of architecture in Slovakia.
It is also necessary, even for construc-
tions of let say medium size, to develop
detail design. I have met several times
with the unwillingness of an Investor,
in comparison to the costs of con-
struction, to invest only small finan-
cial means for the detailed design and
subsequently implement the construc-
tion only on the basis of the design for
building permit. It can subsequently
cause problems during the construc-
tion implementation and at the end
also a significant increase of the price
of construction.
What is the company KAMI PROFIT,
s. r. o. like in this regard?
The company KAMI PROFIT, s. r. o.
as the construction implementer, es-
pecially during the implementation,
but also during the project implemen-
tation, has proposed several simplifi-
cations and improvements of the tech-
nical solutions of the individual parts
of the building, which surely had an
impact on streamlining the entire con-
struction. The communication was on a
very good level, which certainly helped
to trouble free and rapid implementa-
tion of the construction.
Section A – A Section C – C
Architect´s opinion: Matej Brašeň
Photos from the course of implementation
http://www.floowie.com/sk/citaj/kamiprofit-aj/96 KAMI PROFIT
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 97
The retail outlet
is situated in
the New Town of
Bratislava between
the Račianska
and Kukučínova
streets.
The purpose and function in the leading role.
Retail outlet building is primarily formed by one-storey
mass with a geometric shape of a block, which is placed
on a rectangular floor plan.
The construction of retail outlet of Billa
food chain is situated in the New Town of
Bratislava between the Račianska and Ku-
kučínova streets. The architectural expres-
sion of the retail outlet building is simple,
subordinated to the purpose and functions,
based on the architecture of buildings of
such a purpose. The building is designed as
an unaffected, free-standing mass.
In terms of construction and architectu-
ral design the building is formed by primary
one-storey mass with a geometric shape of
a block, of a rectangular shape in the flo-
or plan with flat roof, ending with attic at
an elevation of +6.2 m to ±0,000. Maximum
floor plan dimensions of the building are
34.14 × 50.04 m, with a total built up area
of 1,708,88 m2. The building is of one-storey
without basement. Retail building is divided
into the following functional units:
Shop with entrance part, shop board for
sale of delicacies, shop board for pas-
try baking and shop board for cutting of
fresh meat
Office space
Space for rent
Facilities with storage and production
spaces, spaces for preparation, technical
rooms, changing rooms and rooms for
social facilities
Space for supply yard
The vertical load-bearing building
structure is made up of prefabricated re-
inforced concrete pillars. Module design of
the main pillars of the building is 2×16.75
m in the transversal direction and 3×12.0
m + 1×13.4 m in the longitudinal direction.
Wind-pillars, which are positioned betwe-
en the main pillars, are placed along the
perimeter of the building. The roof struc-
ture of the building is made up of full-wall
pre-stressed reinforced concrete tie-be-
ams, placed in the slope to the sides of the
hall, on which the pre-stressed reinforced
tie-beams with corrugated sheet are pla-
ced. The circumferential stiffening agent
will be placed on pillars along the peri-
meter of the building. The roof structure
of two-aisle hall is sloped from the central
pillars to the circumferential, so the cen-
tral pillars have a greater height than the
circumferential ones. All pillars have ad-
justed foot (profiled bottom of the pillar)
that is inserted into the head of a pile and
grouted with sealing concrete.
This ensures precise connection of the
pillars with the tambour and the pile. Inner
central pillars have a rectangular cross-
-section of 450 mm × 400 mm. All circumfe-
rentialpillarshavea squarecross-sectionof
400 mm × 400 mm. The pillars are designed
from C40/50 concrete and 10505(R) steel.
Building cladding is made from a lightwei-
ght insulating wall panels that are anchored
directly into the reinforced concrete frame
and into the auxiliary steel structure.
Billa Račianska
Construction supervision
http://www.floowie.com/sk/citaj/kamiprofit-aj/98 KAMI PROFIT
Appropriate choice of construction materials taking into account
the detail in the architecture as well as the colour solution are
a prerequisite for simple and clean shaped architecture.
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 99
RETAIL OUTLET
BILLA, BRATISLAVA
Project management:
Roman Jánoška
Project location:
Bratislava – The New Town,
Račianska street,
plot no. 11744/11
Investor:
BILLA REALITY SLOVENSKO, spol. s r. o,
Bajkalská 19/A, P. O. box 57,
821 02 Bratislava
Designer:
PORTIK, spol. s r. o., Trnavská cesta 102,
821 01 Bratislava, Pavol Fabian
Commencement of works:
October 2012
Completion of works:
March 2013
Total investment:
€ 1.5 mil. excluding VAT
Activities of the KAMI PROFIT, s. r. o.:
Construction supervision
Billa Račianska
http://www.floowie.com/sk/citaj/kamiprofit-aj/100 KAMI PROFIT
Layout
Section A – A
Entrance into the store Parking area Space in front of cash registers
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 101
Section B – B
Photos from the course of implementation
Floor plan
Billa Račianska
http://www.floowie.com/sk/citaj/kamiprofit-aj/102 KAMI PROFIT
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 103
Small productions
like bread, bakery,
and butchery are
directly connected to
the sales area.
Architectural design of the building is based on its function
Hypermarket´s sales area includes various goods separated
according to the assortment creating a single operational whole.
Small independent operations of a food character are directly linked
to this sales area.
The building of Hypernova shopping
centre is located on the north-eastern
edge of the Sekčov housing estate in
direct contact with the cadastral area of
Ľubotice municipality. From transport
point of view, it is directly connected to
the Mk2 urban road and the street of
Armádneho generála Svobodu. Single-
-storey industrial structure with free
headroom of about 6.5 meters has a re-
inforced concrete support system. The
external cladding is a sandwich one with
two-sided sheet metal coating and in-
ternal thermal insulation. Fire partition
structures are planned to be bricked and
of agglomerated parts. Support structu-
res of built in mezzanine are also de-
signed from reinforced concrete struc-
tures. A gallery is connected directly to
the hypermarket forming together one
business whole.
Architectural design of the object is
based on its function, being simple and
emphasizing the entrance part. The
main entrance is through automatic
doors. Via entrance we get into spacio-
us shopping street with boutiques and
services. The shopping street is lit by
roof skylights. Expositions of a different
character and purpose can be held in
this central part. The entrance and exit
continue to this shopping street through
a number of cashiers into open space.
In addition to food and non-food go-
ods, two small operations together with
immediate sales through selling coun-
ters are linked to open sales area. Chan-
ging rooms for staff and canteen for 50
persons are located on the second floor.
Their entrance to the building is through
a separate entrance, which does not in-
terfere with other operations. Technical
spaces are also located on each floor.
Storage spaces are accessible through
lifted supply ramp. Ancillary technical
spaces necessary for the operation of
the shopping centre are located in the
supply yard.
According to the type of goods, the
sales area of the hypermarket is divided
into several sections (food, household
goods, drugstore, stationery and toys),
but it is designed as one integrated ope-
rational whole. Large-capacity wareho-
uses are located in the back part oppo-
site the cashiers. Small productions like
bread, bakery, and butchery are directly
connected to the sales area. Technologi-
cal and administrative spaces are loca-
ted above them.
Technological equipment of sales area
with its small productions consists of:
sales equipment – shelves, sales co-
unters, service rooms, cashiers
freezers and coolers, counters, show-
cases
bakery equipment for the production
process – preparation of pastry, fer-
mentation, baking
butchery equipment for the produc-
tion process – rough cutting of meat,
cleaning, filleting, packing
packaging lines
washing lines
Hypernova Prešov Construction supervision
http://www.floowie.com/sk/citaj/kamiprofit-aj/104 KAMI PROFIT
Facades of individual spaces of the shopping street are
differentiated expressively as well as materially.
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 105
Hypernova Prešov
HYPERNOVA SHOPPING AND
SERVICE CENTRE PREŠOV
Project management:
Milín Kaňuščák
Project location:
Armádneho generála Svobodu street
Prešov
Investor:
Ahold Slovakia, s. r. o., Ivanská cesta 12,
821 04 Bratislava
Architect of the project:
Ing. arch. Ľubomír Sakala
General designer:
Design Studio Plus, s. r. o., Okružná 36,
Prešov
The Contractor:
ZIPP BRATISLAVA, s. r. o.
Commencement of works:
February 2003
Completion of works:
December 2003
Total investment:
€ 4 mil. excluding VAT
Activities of the KAMI PROFIT, s. r. o.:
Project management and construction supervision
http://www.floowie.com/sk/citaj/kamiprofit-aj/106 KAMI PROFIT
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 107
Wide range of possibilities on how to spend a leisure time.
This exclusive wellness hotel Horizont **** in Stará Lesná, which is only two
kilometres away from the centre of Tatranska Lomnica, offers a wide range
of possibilities on how to spend a leisure time, high comfort of services, and
the most advanced equipment for the most demanding guests.
The equipment and design of the
entire hotel is made of precious natural
materials and cedar wood.
Thehotelisequipedbyrestaurantwith
a lounge, lobby bar, cognac bar Cigar
Lounge, a wine bar with a fireplace,
a water bar in the pool, player lounge,
children’s play area with a playground,
multifunctional playground for various
sports activities and outside Grill
House with a terrace and seating. The
Clients could experience the wellness
centre with a relaxing pool, whirlpool
and water attractions, massage centre
with spa treatments, Thai massage
centre, fitness centre and solarium.
There is also a conference hall for 220
people and conference rooms for 20
and 50 people, professional ski room
with ozone cleaning and sports shop.
KAMI PROFIT company realized in
the period from september 2015 to
december 2015 reconstruction of the
interior fittings of hotel and mainly
audio/video technology in the congress
hall, the technology sliding auditorium
created by telescopic tribune wirh
electric motor and LED illumination
and the technology of bar.
Hotel Horizont Supplier of construction works
http://www.floowie.com/sk/citaj/kamiprofit-aj/108 KAMI PROFIT
The Clients could experience the wellness centre
with a relaxing pool.
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 109
Hotel Horizont
Hotel Horizont
Project management:
Ing. Roman Jánoška
Ing. Imrich Sedlák
Project location:
Hotel Horizont, Stará Lesná 178,
059 60 Stará Lesná
Investor:
Tatra Trading International, s.r.o.,
Stará Lesná 178, 059 60 Stará Lesná
Architect:
Ing. Arch. Igor Maťaťa
Commencement of works:
04/09/2015
Completion of works:
15/12/2015
Total investment:
94 641,67 € without VAT
Activities of the KAMI PROFIT, s.r.o.:
Reconstruction of the interior fittings of the hotel
http://www.floowie.com/sk/citaj/kamiprofit-aj/110 KAMI PROFIT
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 111
Greater comfort and aesthetic comfort of guests staying.
Lúčky spa belongs to the oldest spa in Slovakia. It is situated in a
beautiful mountain valley bellow the hillside of Choč on the boundary
line of Orava and Liptov regions, 14 km from the town of Ružomberok.
Spa treatment at Lúčky is among the most effective treatment methods.
Accommodation can be found in the newly reconstructed, comfortable
rooms of the Choč Spa house.
Reconstruction and modernization of
the accommodation facilities has been
implemented in order to carry out the
replacement of tiles in the bathrooms of
thehotelrooms,replacementofsanitary
equipment, door frames including the
door wings. The reconstruction also
included the replacement of horizontal
sanitary distribution system, electricity
distribution system and heating
units including the rising pipes of the
heating system. The wear layers of
floors were changed in the rooms and
hallways. Reconstruction also included
the replacement of the three elevator
cabins, elevator technology and elevator
doors. The objective of reconstruction
and modernization was to achieve
greater comfort and aesthetic comfort
of guests staying.
Hotel Choč Supplier of construction works
http://www.floowie.com/sk/citaj/kamiprofit-aj/112 KAMI PROFIT
Spa treatment at Lúčky is among the most effective
treatment methods.
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 113
Hotel Choč
Hotel CHOČ
Reconstruction and
modernization of the
accommodation facilities
in hotel CHOČ
Project management:
Ing. Tomáš Madi
Project location:
Hotel Choč, 034 82 Lúčky
Investor:
KÚPELE LÚČKY a.s., 034 82 Lúčky
Architect/Designer:
Ing. Ľubomír Hains
Commencement of works:
14/08/2015
Completion of works:
15/12/2015
Total investment:
220 720,20 € without VAT
Activities of the KAMI PROFIT, s.r.o.:
Reconstruction of the interior fittings of the hotel
http://www.floowie.com/sk/citaj/kamiprofit-aj/114 KAMI PROFIT
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 115
Works were quickly and in compliance with all qualitative
conditions and labour safety.
New-building of service station is located on the left motorway rest area
Považská Bystrica of the D1 Motorway section 3,250 – 3,800 km.
The company KAMI PROFIT imple-
mented construction works for this
contract as a general supplier. Con-
struction included building of service
building, roofing of space for refuelling,
building of roads, underground tanks,
manipulation area with stands, area
for refuelling, parking, sewage drain-
age system and septic tank, rainwater
drainage system with oil separator and
technology.
The service building has one floor of
wall and transversal bearing system
and it is covered by a flat roof. Perimeter
support walls are made of ceramic burnt
bricks bonded to the mortar and insulat-
ed by contact insulation system. The flat
roof is insulated with thermal insulation;
the waterproofing is of PVC waterproof-
ing sheet. The support structure of the
roof is made of precast pre-stressed
ceiling panels. Interior spaces of fuel
station are designed in accordance with
the latest standards of the company, ac-
cording to the prepared design manu-
als. From disposition point of view, the
fuel station is divided into the following
parts: a shop, restaurant, toilets for cus-
tomers and facilities. The restaurant is
designed with terrace from the south-
western side. The facilities consists of
storage, office, entrance hall, cleaning
room, toilets for employees with a hall,
washing facilities, cool storage, dry stor-
age, oil storage, dressing room, techni-
cal room and waste storage. Waste stor-
age, oil storage and technical room are
accessible from outside.
Steel roofing of T shape covers the
space for refuelling above the stands
and manipulation area, consisting of
vertical steel columns, which are hori-
zontally connected with the service ob-
ject. The manipulation area is designed
in a structure to prevent leakage of oil
substances into the ground with insula-
tion that resists the oil products. A part
of the service station includes 6 areas
with stands. The refuelling area is used
for filling from the road-tank into three
underground steel double-layer tanks;
each with a volume of 60 m3, and it is in-
sulated against the leakage of oil sub-
stances into the sub-base and enclosed
by a curbstone with ramp in order to
avoid contamination of the surrounding
environment.
Crossing of vehicles through the ser-
vice station area is unidirectional and
guided by fixed traffic signs.
The surface rain water is diverted
from the roofed area for refuelling into
a concrete oil separator. Water from
surface outlet, which is not contami-
nated by oil, is collected from the roof
above the stands through the collector
of roof sediments and opens into rain-
water drainage. Waste water drainage
system is diverted into an underground
septic tank consisting of three inter-
connected prefabricated septic tanks
of a volume of 20 m3. Water connec-
tion, electricity connection, telephone
connection, outdoor lighting, outdoor
elements as price marker, and various
specifying boards were constructed in
the area according to the design man-
ual of the company Shell.
In order to limit the negative impacts
to a minimum rate, it was necessary
from the side of KAMI PROFIT, s.r.o.,
as the general supplier, to ensure the
implementation of works quickly and
in compliance with all qualitative con-
ditions and labour safety. This was ful-
filled, as evidenced by the confirmed
reference from the customer with
a satisfactory evaluation of our work.
SHELL service station
D1 Motorway – Považská Bystrica left motorway rest area
General supplier
http://www.floowie.com/sk/citaj/kamiprofit-aj/116 KAMI PROFIT
Interior spaces are designed in accordance with the latest standards
of the company, according to the prepared design manuals.
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 117
SHELL service station
SHELL service station D1
motorway – Považská
Bystrica
Project management:
Ing. Roman Jánoška
Pavol Hayden
Project location:
SHELL service station, D1 Motorway
– Považská Bystrica, left motorway rest area
Investor:
CBRE Corporate Outsourcing s.r.o.,
Park One, Nám. 1. mája 18
811 06 Bratislava
Architect/Designer:
Michal Stejskal, Ceving spol. s r.o.
Commencement of works:
08/2015
Completion of works:
12/2015
Total investment:
1 626 900 € without VAT
Activities of the KAMI PROFIT, s.r.o.:
General supplier
Complete tendering process – from
preparation of the tender documents up to
the signing of contracts with subcontractors
design and approval of technical alternatives
checking the quality of the works provided by
subcontractors
labour safety monitoring
coordination of subcontractors
approving the monthly statements of
subcontractors
hand-over of the works to the investor
including all documents and tests required for
the hand-over of a serviceable works
http://www.floowie.com/sk/citaj/kamiprofit-aj/118 KAMI PROFIT
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 119
The reconstruction was carried in order to
achieve maximum energy savings.
Reconstruction of Primary school with Nursery school of Karol Rapoš
on the Pionierska street 4 in Brezno was implemented in order to reduce
the overall energy consumption of the building, which fulfils the same
function also after the renovation, however with an increased standard.
This project was co-financed by the European Union from the European
Regional Development Fund, Priority 1 Infrastructure of education.
The building of the Primary school
is built in 70-ies of the last century. The
school has 22 classes, consisting of a
main building and gymnasium; individual
blocks are of two and three storey, where
the classrooms, cabinets, sanitary facili-
ties and corridors are located. The offices
for the school management are located
in a separate block. The dining room
with kitchen facilities and storage spaces
is in another separate block. Design of
technical solution for the reconstruction
consisted mainly of replacement of the
original windows with new plastic win-
dows with double glazing unit, replace-
ment of all original external glazed walls
with entrance doors with aluminium ones
with intermittent thermal bridge and dou-
ble glazing unit. All original interior glass
walls with the entrance doors were re-
placed with aluminium walls with single
glazing. Perimeter exterior walls were
insulated by contact insulation system.
Regarding the roof, it has been also insu-
lated and equipped with new roofing; new
roof drains with heating, new plumbing
products of galvanized sheet metal and a
new lightning rod were installed.
The works began in September, and in
less than two months the works was hand-
ed over to the city. Thus, after many years,
the pupils, parents, school employees on
Pionierska street in Brezno finally experi-
ence more dignifying spaces for educa-
tion; and above all, by reducing the energy
intensity of building, the management of
school and the City of Brezno has acceded
to reduce the energy costs, thereby saving
considerable finances.
Primary school in Brezno
General supplier
http://www.floowie.com/sk/citaj/kamiprofit-aj/120 KAMI PROFIT
The proposed modifications of the main entrance represented
the replacement of wear layer of stairs and replacement of worn
stone pavement – in order to avoid accidents.
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 121
Primary school in Brezno
Primary school in brezno
Reconstruction of Primary school
with Nursery school in Brezno
Project management:
Ing. Ľuboš Kormaník
Project location:
Reconstruction of school of Karol Rapoš
on the Pionierska street 4 in Brezno
Investor:
Town Brezno, Nám. M. R. Štefánika 1,
977 01 Brezno
Architect/Designer:
Ing. Július Žiška
Commencement of works:
23/09/2015
Completion of works:
30/11/2015
Total investment:
649 890,40 € without VAT
Activities of the KAMI PROFIT, s.r.o.:
General supplier
Complete tendering process – from
preparation of the tender documents up to
the signing of contracts with subcontractors
design and approval of technical alternatives
checking the quality of the works provided by
subcontractors
labour safety monitoring
coordination of subcontractors
approving the monthly statements of
subcontractors
hand-over of the works to the investor
including all documents and tests required for
the hand-over of a serviceable works
http://www.floowie.com/sk/citaj/kamiprofit-aj/122 KAMI PROFIT
Lightning insulation – detail Connection to wall coverings – detail
Plinth – detail Windowsill – detail
External doors and windows replacement Complete windows replacement
View
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 123
Window lining – detail Window lintel – detail
Bat boxes on the facade, free entrances Roof reconstruction
Low attic – detail High attic – detail
Primary school in Brezno
http://www.floowie.com/sk/citaj/kamiprofit-aj/124 KAMI PROFIT
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 125
Reconstruction and renovation of the Primary school of Gyula Szabó –
with Hungarian language of instruction in Dunajská Streda was carried
out on the basis of reasoned request of the city and management of the
school to renovate the school building, which was considerably worn
and failed to meet the heat and technical requirements of today.
In order to achieve maximum energy
savings, the reconstruction was carried out
including the implementation of a comple-
te replacement of windows, insulation of
all external walls of the building by contact
insulation system from the outside of the
structure and thermal insulation of flat roof.
Financing has been provided from own
resources, state budget and the funds of
the Regional Operational Programme,
Priority 1 Infrastructure of education.
Ground shape of the school building de-
sign is atypical, designed in the shape of
the letter „H“, with the largest dimensions
101,8 meters in length and 88,90 in wi-
dth. It is a basement building of multiple
ground plan.
There are 13 classes for the pupils of
the 1st to the 4th year on the ground. In
addition to the classes, the ground floor
is equipped with cabinets, offices of the
Directorate (accounting department,
child psychologist, dentist), social and
sanitary rooms. In a separate basement
block, there is a kitchen with dining
room, bathrooms and buffet. The spaces
of clubhouse equipped with kitchenette
and bathroom facilities are located next
to the kitchen.
Small and large gym with roof light
of upper windows is situated in another
separate block. The block is equipped
with the necessary sanitary facilities like
shower, wash room, changing rooms,
toilets, cabinets for gym teachers and
boiler room with the storage, gas con-
nection and daily room for the boilerman.
On the second floor, there are mostly
classrooms, cabinets, sanitary facilities,
corridors, staffroom, computer centre
and special classrooms. The top floor is
equipped with specialized classrooms
for biology, chemistry and physics with
the respective cabinets for teachers.
Characteristic data of the building:
Plot size 23,270 m2
Built-up area 1.PP 150.25 m2
Built-up area
(ground plan of 1st floor) 3712,5 m2
Built-up area
(ground plan of 2nd floor) 2615, 00 m2
Built-up area
(ground plan of 3rd floor) 462.75 m2
The maximum height of attic 10.92 m
The emphasis of the reconstruction
was to improve the safety of pupils and
teachers. For example, the proposed
modifications of the main entrance re-
presented the replacement of wear layer
of stairs and replacement of worn stone
pavement. Both elements, being dan-
gerous from a view of possible slipping,
were renovated in order to avoid acci-
dents. Another example of rational solu-
tion for better and safer interior was the
removal of wooden glazed walls at full
height and width of the entrance area,
with double entrance doors, which were
in considerably bad condition. The ste-
el partition walls with a stop on window
structures were also disassembled. In
order to increase the safety of students,
the glazed parts of classroom walls from
the side of corridors were replaced by the
masonry structure up to the door height
and lighting strip of 800 mm height – sky-
lights with fixed glazing of safety glass.
The social facilities were reconstructed
and modernized in the school in order to
increase the hygienic comfort of students
– in total 18 sanitary blocks, 9 of them for
boys and 9 for girls. The rooms for clea-
ners were also renovated. The renovation
of the sanitary units included the removal
of ceramic tiles and tiling, the sanitary
equipment, as well as the replacement
of the distribution system of water supply
and sewerage. The failure on horizontal
sewerage was removed. The sanitary fa-
cilities for disabled persons were imple-
mented on the first floor.
Reconstructionofroofinsulationaroused
the need for replacement of roof drains and
ventilation heads. All plumbing structures
and lightning rod were also disassembled
and replaced.
Within the energy saving measures, the
heating units were replaced; the original
iron radiators were dismantled together
with heating tubes and then replaced by
new radiators with thermostatic head and
thermostatic valve. The piping system was
also renewed. Saving of operational costs
was achieved also by the replacement of the
lighting in the classrooms.
Reconstruction and renovation of the Pri-
mary school of Gyula Szabó was carried out
in the required quality, in due time and to the
full satisfaction of the contracting authority,
as demonstrated by the reference published
on the portal of public procurement.
Primary school in Dunajská Streda
General supplier
http://www.floowie.com/sk/citaj/kamiprofit-aj/126 KAMI PROFIT
The roof has been insulated and equipped with new roofing; new roof
drains with heating, new plumbing products of galvanized sheet metal
and a new lightning rod were installed.
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 127
Primary school in Dunajská Streda
Primary school
in dunajská streda
Reconstruction and renovation
of the Primary school of Gyula
Szabó – with Hungarian language
of instruction in Dunajská Streda
Project management:
Pavol Hayden
Ing. Roman Jánoška
Project location:
Primary school of Gyula Szabó,
Školská 936/1, 929 01 Dunajská Streda
Investor:
Town Dunajská Streda, Hlavná 50/16,
929 01 Dunajská Streda
Architect/Designer:
Ing. Arch. Bodó Pavol
Commencement of works:
08/2015
Completion of works:
10/2015
Total investment:
642 937 € without VAT
Activities of the KAMI PROFIT, s.r.o.:
General supplier
Complete tendering process – from
preparation of the tender documents up to
the signing of contracts with subcontractors
design and approval of technical alternatives
checking the quality of the works provided by
subcontractors
labour safety monitoring
coordination of subcontractors
approving the monthly statements of
subcontractors
hand-over of the works to the investor
including all documents and tests required for
the hand-over of a serviceable works
http://www.floowie.com/sk/citaj/kamiprofit-aj/128 KAMI PROFIT
OVERVIEW
OF REFERENCES
5
www.kami-profit.sk
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 129
Hypernova shopping and
service centre, Prešov,
Arm. gen. Svobodu, Prešov
Technology and
Incubator centre in
Prešov
MAX Trenčín,
street of gen. M. R.
Štefánika 426, Trenčín
MAX Poprad,
Dolné hony 1, Poprad
MAX Nitra,
Chrenovská 30, Nitra
Residential complex III Veže,
Bajkalská street,
Bratislava
MAX Prešov,
Vihorlatská 2, Prešov
Restaurant Towers Bratislava,
Bajkalská street,
Bratislava
Industrial and Technological
Park in Trnava,
Priemyselná 5, Trnava
Fit out Office Lenovo,
Einsteinova, Bratislava
Ballymore Eurovea
Bratislava
Production of non-woven
fabrics,POLYVLIES PP Sereď I.
phase, Priemyselná, Sereď
Pelicantravel Bratislava,
Námestie SNP, Bratislava
Billa Carlton Bratislava,
Hviezdoslavovo
námestie, Bratislava
Billa Headquarters,
Bajkalská street,
Bratislava
Billa Central, Trnavské
mýto, Bratislava
Reconstruction of the former
barracks – Kulturpark Košice,
Kukučínova street, Košice
Construction of a new unit for
production of polyethylene
LDPE4, Vlčie hrdlo, Bratislava
Billa Bánovce nad Bebravou,
Smrečianska street,
Bánovce nad Bebravou
Billa Račianska,
Račianska street,
Bratislava
Buildings of Wüstenrot – WP
+ WSS, Karadžičova 17,
Grösslingová 77, Bratislava
Billa Topoľčany
Billa in Eurovea Bratislava,
Pribinova street,
Bratislava
Wüstenrot Branch office,
Grösslingová 62,
Bratislava
Reconstruction of the Kožatex
administrativebuilding,Karadžičova
17, Grösslingová 77, Bratislava
Production of non-woven
fabrics, POLYVLIES PP Sereď II.
phase, Priemyselná, Sereď
Billa in Nitra,
Hviezdoslavova trieda,
Nitra
Billa in Handlová,
M. Kršákovej, Handlová
Dubnička V. Apartment
buildings, Bánovce nad
Bebravou, Svätoplukova
RKSA Šamorín (sport-
congress complex) – HIPO
Arena
D1 Motorway Hričovské
Podhradie – Lietavská
Lúčka, Ovčiarsko tunnel
D1 Motorway Lietavská
Lúčka – Višňové – Dubná
Skala, Višňové tunnel
SHELL FUEL STATION , Prešov
Levočská, Levočská street,
Prešov
Slovnaft Fuel station
in Terchová and
Námestovo
Fuel station SHELL Červeník,
cadastral area Červeník,
Hlohovec District
Allianz, Karloveská street,
Bratislava
Distribution warehouse in
Sereď
Slovnaft fuel station
in Lučenec – Opatová
SHELL fuel station
in Lučenec
Reconstruction of
Elementary school
on Pionierska 4, Brezno
Reconstruction of
Elementary school
in Dunajská Streda
Hotel Choč
in Lúčky
Hotel Horizont
in Stará Lesná
Shell fuel station
Považská Bystrica
Billa
in Lučenec
Slovnaft fuel station
in Banská Bystrica
Shell fuel station
in Banská Bystrica
Slovnaft fuel station
in Budča
Slovnaft fuel station
in Žiar nad Hronom
1
2
3
4
5
6
7
8
9
10 23
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
24
25
26
27
28
29
30
31
32
33
11
14
15
16
17
18
19
20
21
22
1
5
12 26 37
27 38
4
43
17
3
44
22
28
48
49
46 47
40
42
34
29
19
9
30
41
35
34
31
32
2 7 33
Prešov
Nitra
Lučenec
Sereď
Poprad
Košice
Trenčín
Považská
Bystrica
Topoľčany
Handlová
Budča
Žiar nad
Hronom
Banská
Bystrica
Brezno
Lúčky
Terchová
Bánovce nad
Bebravou
Trnava
Červeník
Šamorín
Dunajská
Streda
Ovčiarsko
Višňové
Bratislava
6 8 10 11 13
14 15 16 18 20
21 24 25 36
23
Námestovo
39 45
12
13
Stará Lesná
http://www.floowie.com/sk/citaj/kamiprofit-aj/130 KAMI PROFIT
OVERVIEW OF REFERENCES
Project name:
Hypernova shopping and service centre
in Prešov
Project location:
street of Armádneho generála Svobodu,
Prešov
Type of construction:
new-building
General supplier:
AHOLD RETAIL Slovakia, s. r. o.
Activity:
project management
Author - architect/designer:
Ľubomír Sakala/Design Studio Plus, s. r. o.
Construction commencement:
3/2004
Construction completion:
10/2004
Total investment:
€ 4 mil.
Project management:
Milín Kaňuščák
Project name:
Technology and Incubator centre
in Prešov
Project location:
Prešov
Type of construction:
reconstruction
General supplier:
RPIC Prešov
Activity:
Project management + stavebný dozor
Construction commencement:
1/2005
Construction completion:
12/2005
Total investment:
€ 300,000.00
Project management/stavebný dozor:
Ing. Milín Kaňuščák
Project name:
MAX Trenčín
Project location:
street of gen. M. R. Štefánika 426, Trenčín
Type of construction:
new-building
General supplier:
EUROMAX SLOVAKIA, s. r. o.
Activity:
Project management
Author - architect/designer:
Adamec&Adamec, spol. s r. o.
Construction commencement:
1/2005
Construction completion:
11/2005
Total investment:
€ 26 mil.
Project management:
Milín Kaňuščák
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 131
Project name:
MAX Poprad
Project location:
Dolné hony 1, Poprad
Type of construction:
new-building
General supplier:
EUROMAX SLOVAKIA, s. r. o.
Activity:
Project management
Author - architect/designer:
Adamec&Adamec, spol. s r. o.
Construction commencement:
1/2005
Construction completion:
11/2005
Total investment:
€ 23 mil.
Project management:
Milín Kaňuščák, Pavol Adamec
Project name:
Residential complex III Veže
Project location:
Bajkalská street, Bratislava
Type of construction:
new-building
General supplier:
CRESCO GROUP, a. s.
Activity:
Project management
Author - architect/designer:
Martin Wolf, SCB & Associates, Inc.,
Chicago, USA, Peter Moravčík
Construction commencement:
2006
Construction completion:
2009
Total investment:
€ 80 mil.
Project management:
Milín Kaňuščák, Roman Jánoška,
Ľuboš Kormaník
Project name:
MAX Nitra
Project location:
Chrenovská 30, Nitra
Type of construction:
new-building
General supplier:
EUROMAX SLOVAKIA, s. r. o.
Activity:
Project management
Author - architect/designer:
Adamec&Adamec, spol. s r. o.
Construction commencement:
3/2006
Construction completion:
12/2006
Total investment:
€ 25 mil.
Project management:
Milín Kaňuščák
http://www.floowie.com/sk/citaj/kamiprofit-aj/132 KAMI PROFIT
OVERVIEW OF REFERENCES
Project name:
MAX Prešov
Project location:
Vihorlatská 2, Prešov
Type of construction:
new-building
General supplier:
EUROMAX SLOVAKIA, s. r. o.
Activity:
Project management
Author - architect/designer:
Design Studio Plus, Prešov
Construction commencement:
4/2007
Construction completion:
7/2008
Total investment:
€ 25 mil.
Project management:
Milín Kaňuščák
Project name:
Restaurant Towers
Project location:
Bajkalská 9, Bratislava
Type of construction:
rebuilding
General supplier:
N3 Towers, s. r. o.
Activity:
Project management
Construction commencement:
2009
Construction completion:
2009
Project management:
Milín Kaňuščák
Project name:
Industrial and Technological Park in Trnava
Project location:
Priemyselná 5, Trnava, cadastral area Trnava
Type of construction:
reconstruction, new-building and change
of completed building
General supplier:
Dúha, a. s. – Trnavská stavebná spoločnosť, a. s.
Activity:
Project management
Author - architect/designer:
Ateliér DV, s. r. o.
Construcion commencement:
9/2009
Construction completion:
2/2012
Total investment:
€ 10 mil.
Project management:
Roman Jánoška, Milín Kaňuščák, Peter Janega
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 133
Project name:
Fit out Office Lenovo
Project location:
Einsteinova street, Bratislava
Type of construction:
rebuilding
General supplier:
TECHO, s. r. o.
Activity:
Project management
Construction commencement:
2010
Construction completion:
2010
Total investment:
€ 200,000.00
Project management:
Milín Kaňuščák
Project name:
Ballymore Eurovea Bratislava, offices
Project location:
Eurovea, Bratislava
Type of construction:
rebuilding of spaces
General supplier:
Modřanské strojírny
Activity:
Project management
Construction commencement:
2011
Construction completion:
2011
Project management:
Roman Jánoška
Project name:
Production of non-woven fabrics,
POLYVLIES PP Sereď I. phase
Project location:
Priemyselná street, Sereď
Type of construction:
new-building, industrial hall
General supplier:
Polyvlies Slovakia, s. r. o.
Activity:
Project management
Construction commencement:
2011
Construction completion:
2012
Total investment:
€ 1 mil.
Project management:
Ľuboš Kormaník
http://www.floowie.com/sk/citaj/kamiprofit-aj/134 KAMI PROFIT
OVERVIEW OF REFERENCES
Project name:
Pelicantravel Bratislava
Project location:
Námestie SNP, Bratislava
Type of construction:
reconstruction of premises
General supplier:
Pelicantravel.com, s. r. o.
Activity:
construction supervision
Construction commencement:
6/2012
Construction completion:
6/2012
Total investment:
€ 130,000.00
Project management:
Roman Jánoška
Project name:
Billa Carlton Bratislava
Project location:
Hviezdoslavovo námestie, Bratislava
Type of construction:
reconstruction
General supplier:
Billa, s. r. o.
Activity:
construction supervision
Construction commencement:
2012
Construction completion:
2012
Total investment:
€ 300,000.00
Project management:
Peter Janega
Project name:
Billa Headquarters
Project location:
Bajkalská street, Bratislava
Type of construction:
new-building
General supplier:
Billa, s. r. o.
Activity:
construction supervision
Construction commencement:
6/2012
Construction completion:
2/2013
Total investment:
€ 480,000.00
Project management:
Roman Jánoška
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 135
Project name:
Billa Central
Project location:
Trnavské mýto, Bratislava
Type of construction:
new-building
General supplier:
Billa, s. r. o.
Activity:
construction supervision
Construction commencement:
4/2012
Construction completion:
5/2013
Total investment:
€ 800,000.00
Project management:
Roman Jánoška
Project name:
Construction of a new unit for
production of polyethylene LDPE4
Project location:
Vlčie hrdlo 1, Bratislava
Type of construction:
rebuilding
General supplier:
Slovnaft, a. s.
Activity:
construction supervision
Construction commencement:
9/2012
Construction completion:
up to now
Total investment:
€ 380 mil.
Project management:
Rastislav Kútny
Project name:
Reconstruction of the former barracks
– Kulturpark Košice
Project location:
Kukučínova street, Košice
Type of construction:
reconstruction
General supplier:
Doprastav, a. s.
Activity:
Project management
Author - architect/designer:
Irakli Eristavi, zerozero
Construction commencement:
7/2012
Construction completion:
7/2013
Total investment:
€ 20,312,000.00
Project management:
Peter Janega
http://www.floowie.com/sk/citaj/kamiprofit-aj/136 KAMI PROFIT
OVERVIEW OF REFERENCES
Project name:
Billa Račianska street, Bratislava
Project location:
Račianska, Bratislava
Type of construction:
reconstruction
General supplier:
Billa, s. r. o.
Activity:
construction supervision
Construction commencement:
10/2012
Construction completion:
3 /2013
Project management:
Lukáš Šulík, Roman Jánoška
Project name:
Billa in Bánovce nad Bebravou
Project location:
Smrečianska street, Bánovce nad
Bebravou
Type of construction:
reconstruction and enlargement of sales
area
General supplier:
Billa, s. r. o.
Activity:
construction supervision
Construction commencement:
9/2012
Construction completion:
10/2012
Project management:
Milan Kaňuščák
Project name:
Buildings of Wüstenrot – WP + WSS,
Wüstenrot – insurance company and
Wüstenrot – building society,
Karadžičova 17, Grösslingová 77, Bratislava
Project location:
Karadžičova 17, Grösslingová 77, Bratislava
Type of construction:
reconstruction – interconnection of two
buildings on 6 th floor
General supplier:
KAMI PROFIT, s. r. o.
Activity:
General supplier
Author - architect/designer:
s_form., spol. s r. o., Juraj Šimek
Construction commencement:
15 February 2013
Construction completion:
25 February 2013
Total investment: € 16,300.00
Project management: Pavol Hayden
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 137
Project name:
Billa Topoľčany
Project location:
Topoľčany
Type of construction:
construction supervision
General supplier:
Billa, s. r. o.
Activity:
reconstruction
Construction commencement:
3/2013
Construction completion:
5/2013
Total investment:
€ 200,000.00
Project management:
Milan Kaňuščák
Project name:
Billa Eurovea Bratislava
Project location:
Pribinova street, Bratislava
Type of construction:
construction supervision
General supplier:
Billa, s. r. o.
Activity:
reconstruction and enlargement
of the sales area
Construction commencement:
3/2013
Construction completion:
7/2013
Total investment:
€ 500,000.00
Project management:
Lukáš Šulík
Project name:
Wüstenrot Branch Office
Project location:
Grösslingová 62, Bratislava
Type of construction:
reconstruction
General supplier:
WÜSTENROT stavebná sporiteľňa, a. s.
Activity:
general contractor
Construction commencement:
5/2013
Construction completion:
6/2013
Total investment:
€ 100,000.00
Project management:
Pavol Hayden
http://www.floowie.com/sk/citaj/kamiprofit-aj/138 KAMI PROFIT
OVERVIEW OF REFERENCES
Project name:
Reconstruction of the Kožatex
administrative building
Project location:
Karadžičova 17, Grösslingová 77, Bratislava
Type of construction:
reconstruction
General supplier:
KAMI PROFIT, s. r. o.
Activity:
General supplier + Project management
Author - architect/designer:
s_form., spol. s r. o., Juraj Šimek,
Martin Šimek
Construction commencement:
24 May 2013
Construction completion:
19 November 2013
Total investment:
€ 1.5 mil.
Project management:
Roman Jánoška, Pavol Hayden
Project name:
Billa Nitra
Project location:
Hviezdoslavova trieda, Nitra
Type of construction:
reconstruction and enlargement
of sales area
General supplier:
Billa, s. r. o.
Activity:
construction supervision
Construction commencement:
9/2013
Construction completion:
11/2013
Project management:
Lukáš Šulík
Project name:
Production of non-woven fabrics,
POLYVLIES PP Sereď II. phase
Project location:
Priemyselná street, Sereď
Type of construction:
new-building, industrial hall
General supplier:
AJ Team, s. r. o.
Activity:
Project management
Construction commencement:
6/2013
Construction completion:
3/2014
Total investment:
€ 1.5 mil.
Project management:
Ľuboš Kormaník
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 139
Project name:
Dubnička V. Apartment buildings,
Bánovce nad Bebravou
Project location:
Svätoplukova street, Bánovce nad Bebravou
Type of construction:
new-building
General supplier:
TEXO PARTNER, a. s.
Activity:
Project management, general contractor
Author - architect/designer:
Matej Brašeň, Zoltán Belokostolský
Construction commencement:
4/2014
Construction completion:
12/2014
Total investment:
€ 1,075,000.00
Project management:
Pavol Hayden
Project name:
RKSA (sport-congress komplex)
Šamorín – HIPO Arena
Project location:
Šamorín
Type of construction:
new-building
General supplier:
Dúha, a. s.
Activity:
construction supervision
Construction commencement:
6/2014
Construction completion:
9/2014
Total investment:
€ 40 mil.
Project management:
Imrich Sedlák
Project name:
Billa Handlová
Project location:
M. Kršákovej, Handlová
Type of construction:
reconstruction
General supplier:
Billa, s. r. o.
Activity:
construction supervision
Construction commencement:
9/2013
Construction completion:
10/2013
Total investment:
€ 400,000.00
Project management:
Milan Kaňuščák
http://www.floowie.com/sk/citaj/kamiprofit-aj/140 KAMI PROFIT
OVERVIEW OF REFERENCES
Project name:
D1 Motorway Hričovské Podhradie
– Lietavská Lúčka, Ovčiarsko tunnel
Project location:
cadastral area Dolný Hričov, Ovčiarsko,
Žilina district
Type of construction:
new-construction
General supplier:
Joint Venture Ovčiarsko
Activity:
Project management
Author - architect/designer:
Basler & Hofmann Slovakia
Construction commencement:
6/2014
Construction completion:
2018
Total investment:
€ 91.2 mil.
Project management:
Peter Janega, Milín Kaňuščák
Project name:
D1 Motorway Lietavská Lúčka – Višňové
– Dubná Skala, Višňové tunnel
Project location:
Žilina Region, Žilina District, Martin,
Municipalities:
Lietavská Lúčka, Žilina
– Bytčica, Porúbka, Turie, Rosina,
Višňové, Lipovec, Vrútky, Turčianske Kľačany
Type of construction:
new-construction
General supplier:
SALINI IMPREGILO S. p. A., DÚHA, a. s.
Activity:
Project management
Author - architect/designer:
Geoconsult, Terraprojekt, a. s., RockSoil
S. p. A., Ferro
Construction commencement: 6/2014
Construction completion: 12/2019
Total investment: € 410 mil.
Project management:
Milín Kaňuščák
Project name:
Shell Fuel station in Prešov Levočská
Project location:
Levočská street, Prešov
Type of construction:
reconstruction
Activity:
contractor
Construction commencement:
7/2014
Construction completion:
8/2014
Total investment:
€ 120,000.00
Project management:
Roman Jánoška
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 141
Project name:
Slovnaft Fuel station
Project location:
Terchová, Námestovo
Type of construction:
reconstruction
General supplier:
Slovnaft, a. s.
Activity:
Project management
Construction commencement:
11/2014
Construction completion:
12/2014
Total investment:
€ 110,000.00
Project management:
Pavol Hayden
Project name:
SHELL Červeník Fuel station
Project location:
cadastral area Červeník, Hlohovec District
Type of construction:
reconstruciton
General supplier:
KAMI PROFIT, s. r. o.
Activity:
General supplier + Project management
Construction commencement:
11/2014
Construction completion:
12/2014
Total investment:
€ 223,000.00
Project management:
Ľuboš Kormaník, Alexander Halža
Project name:
Allianz Karloveská street, Bratislava
Project location:
Karloveská street, Bratislava
Type of construction:
reconstruction of interior spaces
General supplier:
Allianz – Slovenská poisťovňa, a. s.
Activity:
contractor
Construction commencement:
12/2014
Construction completion:
3/2015
Total investment:
€ 32,000.00
Project management:
Juraj Šnirc
http://www.floowie.com/sk/citaj/kamiprofit-aj/142 KAMI PROFIT
OVERVIEW OF REFERENCES
Project name:
Distribution warehouse in Sereď
Project location:
Sereď
Type of construction:
new construction
Activity:
Construction and technical supervision
Construction commencement:
3/2015
Construction completion:
1/2016
Total investment:
€ 30 mil.
Project management:
Ing. Ľuboš Kormaník, Ondrej Pšenko,
Ing. Miroslav Bugár
Project name:
Supermarket Billa
Project location:
Gallery Lučenec, supermarket Billa
Type of construction:
new construction
Investor:
Billa, s. r. o.
Activity:
Construction supervision
Construction commencement:
8/2015
Construction completion:
10/2015
Total investment:
€ 170 000.00
Project management:
Ing. Tomáš Madi
Project name:
Slovnaft fuel station
in Lučenec – Opatová
Project location:
Lučenec, Opatová
Type of construction:
reconstruction
Investor:
Slovnaft, a.s., Vlčie hrdlo 1,
824 12 Bratislava
Activity:
Project management
Construction commencement:
6/2015
Construction completion:
9 /2015
Total investment:
€ 500 000.00
Project management:
Ing. Štefan Litomerický, Pavol Hayden
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 143
Project name:
Primary scholl in Dunajská Streda
Project location:
Školská street, Dunajská Streda
Type of construction:
reconstruction and renovation
General supplier:
Town Dunajská Streda
Activity:
General supplier
Author - architect/designer:
Ing. Arch. Bodó Pavol
Construction commencement:
8/2015
Construction completion:
10/2015
Total investment:
€ 642 937.00
Project management:
Pavol Hayden, Ing. Roman Jánoška
Project name:
Hotel Choč
Project location:
Lúčky
Type of construction:
reconstruction of the interior
fittings of the hotel
General supplier:
KÚPELE LÚČKY, a. s.
Activity:
Supplier of construction works
Author - architect/designer:
Ing. Ľubomír Hains
Construction commencement:
8/2015
Construction completion:
12/2015
Total investment:
€ 220 720.20
Project management:
Ing. Tomáš Madi
Project name:
SHELL service station
Project location:
D1 Motorway – Považská Bystrica,
left motorway rest area
Type of construction:
new-building
General supplier:
CBRE Corporate Outsourcing, s. r. o.
Activity:
General supplier
Author - architect/designer:
Michal Stejskal, Ceving, spol. s r. o.
Construction commencement:
8/2015
Construction completion:
12/2015
Total investment:
€ 1 626 900.00
Project management:
Ing. Roman Jánoška, Pavol Hayden
http://www.floowie.com/sk/citaj/kamiprofit-aj/144 KAMI PROFIT
OVERVIEW OF REFERENCES
Project name:
SHELL Fuel station in Banská Bystrica
Project location:
street „ Partizánska cesta“,
Banská Bystrica
Type of construction:
reconstruction
Investor:
CBRE Corporate Outsourcing, s. r. o.
Activity:
General contractor
Construction commencement:
1 0/2015
Construction completion:
11/2015
Total investment:
€ 156 000.00
Project management:
Ing. Marek Eliáš
Project name:
Hotel Horizont
Project location:
Stará Lesná
Type of construction:
reconstruction of the interior
fittings of the hotel
General supplier:
Tatra Trading International, s. r. o.
Activity:
Supplier of construction works
Author - architect/designer:
Ing. Arch. Igor Maťaťa
Construction commencement:
9/2015
Construction completion:
12/2015
Total investment:
€ 94 641.67
Project management:
Ing. Roman Jánoška, Ing. Imrich Sedlák
Project name:
Primary scholl in Brezno
Project location:
Pionierska street, Brezno
Type of construction:
reconstruction of Primary school
with Nursery school
General supplier:
Town Brezno
Activity:
General supplier
Author - architect/designer:
Ing. Július Žiška
Construction commencement:
9/2015
Construction completion:
11/2015
Total investment:
€ 649 890.40
Project management:
Ing. Ľuboš Kormaník
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 145
Project name:
Self-service carwash station on fuel
station Slovnaft in Banská Bystrica
Project location:
street „Partizánska cesta“,
Banská Bystrica
Type of construction:
reconstruction
Investor: Slovnaft, a. s.
Activity:
Project management
Construction commencement: 2/2016
Construction completion: 3/2016
Total investment: € 55 000.00
Project management:
Ing. Štefan Litomerický, Ing. Tomáš Krutek
Project name:
Slovnaft Fuel station in Žiar nad Hronom
Project location:
Ladomerská Vieska, Žiar nad Hronom
Type of construction:
reconstruction
Investor: Slovnaft, a. s.
Activity: Project management
Construction commencement: 2/2016
Construction completion: 3/2016
Total investment: € 31 000.00
Project management:
Ing. Štefan Litomerický
Project name:
Shell fuel station in Lučenec
Project location:
SHELL Lučenec, roadhouse
Halier in Tomášovce
Type of construction:
reconstruction
Investor:
Johnson Controls International, s. r. o.
Activity:
General constructor
Construction commencement: 5/2016
Construction completion: 6/2016
Total investment: € 106 000.00
Project management:
Ing. Ľuboš Kormaník, Ing. Alexander Halža
Project name:
Slovnaft Fuel station in Budča
Project location:
Fuel station North in Budča, Fuel station
South in Budča
Type of construction:
reconstruction
Investor:
Slovnaft, a. s.
Activity:
Project management
Construction commencement: 4/2016
Construction completion: 6/2016
Total investment: € 75 000.00
Project management:
Ing. Štefan Litomerický
http://www.floowie.com/sk/citaj/kamiprofit-aj/Skiing, Schladming 2014
Helicopter flight, Bratislava 2012
Social events
6
146 KAMI PROFIT
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 147
Goose feast, Vajnory 2013
Final building approval of Kulturpark, Košice 2013
http://www.floowie.com/sk/citaj/kamiprofit-aj/Social events
Football Promont cup 2008
Street Workout, Kuchajda 2013
148 KAMI PROFIT
http://www.floowie.com/sk/citaj/kamiprofit-aj/KAMI PROFIT 149
Skiing, Semmering 2013
teambuilding, Bratislava 2012
http://www.floowie.com/sk/citaj/kamiprofit-aj/151
http://www.floowie.com/sk/citaj/kamiprofit-aj/152
http://www.floowie.com/sk/citaj/kamiprofit-aj/152 KAMI PROFIT
10 years of KAMI PROFIT
For KAMI PROFIT, s. r. o., published by JAGA GROUP, s. r. o.
Imricha Karvaša 2, P. O. BOX 61, 810 05 Bratislava 15
Tel: +421 2 50 200 200
www.jaga.sk
Compiled by:
Andrea Dingová, according to support documentation of KAMI PROFIT, s. r. o.
Book design:
Miriam Lukáčová
Photographs and graphs:
KAMI PROFIT, s. r. o., Dano Veselský, Roman Pavlík, Miro Pochyba